4 Network Cable Connections
Figure 36: Looping the Power Cables Through the Strain Relief Straps
Bundling the Signal and Power Cables
Using the hook-and-loop fasteners provided in the shipping box, bundle the cords together as follows:
1. Use a hook-and-loop fastener to bundle the signal cords together and route the bundle toward the left side of
the controller back panel.
2. Use a hook-and-loop fastener to bundle together the two power cables and route them toward the right side
of the controller back panel.
Securing the Signal and Power Cable Bundles to the Rails
The FS7500 controller rails have brackets attached to the rear of each rail. These brackets extend beyond the
back of the system when the rails are installed.