Installing the Switch
|
21
Four-Post Rack-mounting with Cage Nuts
Ensure that there is adequate clearance surrounding the cabinet or rack to permit access and airflow. If
you are installing two S-Series systems side-by-side, position them at least 5 inches (12.7 cm) apart.
Follow the steps below to install the unit into a four-post rack mounting with cage nuts.
3
Set the adjustable rear mounting bracket to the length (one of three lengths) for your bracket. Secure the length
with the four screws.
Figure 4-2. Four-post Rack-mounting with Adjustable Rear-mounting Brackets
Step
Task
1
Attach the two rear brackets to the side panels. Align the three holes in the bracket with the three holes on the
chassis, and secure the brackets to the chassis using the screws.
2
Align and secure the adjustable bracket onto the rear bracket.
Step
Task
fn00148s50
V
fn00147f_s50
V
Align brackets
Top View of Brackets
Summary of Contents for Force10 S50N Series
Page 1: ...Installing S50N and S50V Systems ...
Page 8: ...8 About this Guide w w w d e l l c o m s u p p o r t d e l l c o m ...
Page 40: ...40 Installing Backup Power w w w d e l l c o m s u p p o r t d e l l c o m ...
Page 46: ...46 Installing Ports w w w d e l l c o m s u p p o r t d e l l c o m ...
Page 58: ...58 Technical Support w w w d e l l c o m s u p p o r t d e l l c o m ...
Page 63: ......
Page 64: ...w w w d ell com support dell com Printed in the U S A ...