Site Preparations
|
13
3
Site Preparations
This chapter describes requirements and procedures to install your system in the following topics:
•
•
•
•
•
•
•
For detailed switch specifications, refer to
Chapter , Switch Specifications, on page 47
NOTE:
Install the switch into a rack or cabinet before installing any optional components.
Site Selection
Make sure that the area where you install your switch meets the following safety requirements:
•
Near an adequate power source. Connect the system to the appropriate branch circuit protection as
defined by your local electrical codes. See cautions in
Information Symbols and Warnings on page 5
.
•
Environmental temperature between 32° – 122°F (0° – 50°C).
•
Relative humidity that does not exceed 85% non-condensing.
•
In a dry, clean, well-ventilated and temperature-controlled room, away from heat sources such as hot air
vents or direct sunlight.
•
Away from sources of severe electromagnetic noise.
•
Positioned in a rack, cabinet, or on a desktop with adequate space in the front, rear, and sides of the unit
for proper ventilation, and access.
Cabinet Placement
The cabinet must meet the following criteria:
•
Minimum cabinet size and airflow are according to the EIA standard.
•
Minimum of 5 inches (12.7 cm) between the side intake and exhaust vents and the cabinet wall.
Summary of Contents for Force10 S50N Series
Page 1: ...Installing S50N and S50V Systems ...
Page 8: ...8 About this Guide w w w d e l l c o m s u p p o r t d e l l c o m ...
Page 40: ...40 Installing Backup Power w w w d e l l c o m s u p p o r t d e l l c o m ...
Page 46: ...46 Installing Ports w w w d e l l c o m s u p p o r t d e l l c o m ...
Page 58: ...58 Technical Support w w w d e l l c o m s u p p o r t d e l l c o m ...
Page 63: ......
Page 64: ...w w w d ell com support dell com Printed in the U S A ...