Four-post ReadyRail installation
Use these installation instructions for racks with M5 threaded holes, 9.5 mm (.354 in) square holes, or 7.1 mm (.279) round
holes.
Complete the switch installation in the following order:
1. Attach the inner rails to the switch.
2. Attach the outer rails to the four-post rack.
3. Slide the switch into the rack.
NOTE:
You need a user-supplied Phillips screwdriver to complete this installation.
To install the switch:
1. Remove the rails, rail plates, and screws from the shipping container.
2. Separate the inner rail and the outer rail.
Press the rail clip and pull the inner rail out.
3. Attach the inner rail to the switch.
Line up the inner rail slot with the T-stud on the switch. Push the inner rail back until it clicks into place.
Z9432F-ON switch installation
11