-
12
-
4.2 Assembly SOP
Preparation before assembly
1. Clean the room for disassembly
2. Identify the area for monitor
3. Prepare the equipment, tool and material as bellow:
1) working table
2) Philips-head screwdriver
3) Hex-head screwdriver
4) Glove
5) Cleaning cloth
6) ESD protection
Item
Picture
Operation
Tools
Notes
1
1.
Assemble SPS BD in main
SHD
2.
Insert LVDS cable into I/F BD.
3.
Insert the wire into I/F BD and
assemble I/F BD into Main
SHD
4.
Lock 5 PCB screws and 2 hex
screws
1. Philips-head
screwdriver
Torsion of
PCB screw:
6.5±1.0Kg
2. Hex-head
screwdriver
Torsion of
hex screw:
5.0±0.6Kg
Summary of Contents for E2720HB
Page 1: ...Simplified Service Manual E2720HB Version 01 Date 2021 03 04 ...
Page 7: ... 7 3 Wiring connectivity diagram FFC 1 Wire 1 ...
Page 15: ... 15 5 Trouble shooting instructions ...
Page 16: ... 16 ...
Page 17: ... 17 ...
Page 18: ... 18 ...
Page 19: ... 19 ...
Page 20: ... 20 ...