Table 18 Primary node cabling instructions
String
(Loop)
I/O - Port
Shelf Port
Length
1
I/O 3 - Port 1
B controller HOST
port of shelf V1.1
2M
1
I/O 2 - Port 0
A controller HOST
port of the highest number
shelf in V1
2M
2
I/O 3 - Port 0
B controller HOST
port of shelf V2.1
2M
2
I/O 6 - Port 1
A controller HOST
port of the highest number
shelf in V2
2M
3
I/O 2 - Port 1
B controller HOST
port of shelf V3.1
2M
3
I/O 6 - Port 0
A controller HOST
port of the highest number
shelf in V3
2M
4
I/O 3 - Port 3
B controller HOST
port of shelf V4.1
3M
4
I/O 2 - Port 2
A controller HOST
port of the highest number
shelf in 43
3M
5
I/O 3 - Port 2
B controller HOST
port of shelf V5.1
3M
5
I/O 6 - Port 2
A controller HOST
port of the highest number
shelf in V5
3M
6
I/O 2 - Port 3
B controller HOST
port of shelf V6.1
3M
6
I/O 6 - Port 3
A controller HOST
port of the highest number
shelf in V6
3M
a. Cable lengths shown are designed for Data Domain racks. Longer cables (up to 5M) can be
used.
Table 19 Standby node cabling instructions
String
(Loop)
I/O - Port
Shelf Port
Length
1
I/O 3 - Port 1
A controller EXPANSION
port of shelf V1.1
2M
1
I/O 2 - Port 0
B controller EXPANSION
port of the highest
number shelf in V1
2M
2
I/O 3 - Port 0
A controller EXPANSION
port of shelf V2.1
2M
2
I/O 6 - Port 1
B controller EXPANSION
port of the highest
number shelf in V2
2M
3
I/O 2 - Port 1
A controller EXPANSION
port of shelf V3.1
2M
Connect Cables and Power on
DD9500 /DD9800 with HA (two racks)
61