39
English
www.defa.com
Factory default settings:
• Power line in: TN network
• Main inlet fuse size: 6A
• Total charging current: 6A
• Number of charge points: 1
• Charge point: single-phase
• Configure homeCLU according to your installation.
›
Warning! If homeCLU is configured incorrectly, the main fuse can trip or charging
performance may be decreased.
• After configuring homeCLU, close the communication and disconnect the PC/Android
device.
• Connect the communication cable from the wallbox(es) to homeCLU's communication
port.
Important: To start up homeCLU with the new configuration, disconnect power from homeCLU
and wait for 10 seconds before powering it up again.
Note: in case of a fixed total charging current, shared between each charge point; configure
homeCLU with "No sensor". The homeCLU will no longer measure the load of the fuse
element.