![DeDietrich Vivadens MCR-P 24 User Manual Download Page 27](http://html1.mh-extra.com/html/dedietrich/vivadens-mcr-p-24/vivadens-mcr-p-24_user-manual_2462498027.webp)
8. Wait until water comes out of the bleed valve and then close the
bleed connection.
CAUTION
The water may still be hot.
9. After venting, check whether the pressure in the installation is still
sufficient. Add water to the installation if necessary.
10.Switch on the boiler. A vent cycle of a duration of around 3 minutes
is carried out automatically.
11.Set the room thermostat or the regulator.
T000218-A
T000228-A
1,5 ... 2 bar
T000183-A
MCR-P 24/28 BIC PLUS
6. Checking and maintenance
170915 - 127686-04
26
Summary of Contents for Vivadens MCR-P 24
Page 1: ...Vivadens EN Wall hung gas condensing boilers MCR P 24 28 BIC PLUS User Guide 127686 04...
Page 4: ...3 170915 127686 04...
Page 40: ...11 Appendix MCR P 24 28 BIC PLUS 39 170915 127686 04...
Page 41: ...MCR P 24 28 BIC PLUS 11 Appendix 170915 127686 04 40...
Page 42: ......
Page 43: ......