11
THE BOILER OPTIONS
The materials used for the condensate drain pipes
must be appropriate. Otherwise, the condensate
must be neutralised.
Principle:
Acid condensates are conveyed via a
reservoir filled with granulates before being sent to
the wastewater network.
Mini
150 mm
MCA_F0086
3
2
1
MCA_F0090
EH692
MC
A_F0086
MC
A_F0090
f
lue
system
accessOries
specific
tO
the
innOvens prO mca 160
bOiler
FU
MI_F02
16
Concentric air-flue gas connection conversion kit -
Package EH692
Ø 150 mm to Ø 200 mm adapter -
Package EH645
Air filter -
Package EH646
C330_Q0009
Granulate recharge for neutralisation station -
Ref. 9422-5601 (10 kg)
Granulate recharge for neutralisation station -
Package SA7 (25 kg)
An annual inspection of the system is required,
including a check of the effectiveness of the
granulates via a pH measurement. If necessary,
the granulates must be replaced.
C330_Q0006
SA4
SA3
C330_Q0005
C330_Q0008
DU15
Gravity flow condensate neutralisation station (up to 450 kW) -
Package SA3
Condensate neutralisation station with lift pump:
- Package SA4 for boilers or cascades of boilers up to 300 kW
- Package DU15 for boilers or cascades of boilers up to 1300 kW
EH692
300 mbar gas pressure regulator: - GDJ 20 -
Package SA12
- GDJ 25 -
Package AD245
- GDJ 50 -
Package AD246
It is fitted on the gas inlet circuit. It is needed if the
gas is supplied at a pressure of 300 mbar.
C230_Q0002
Regulator
Max. natural gas flow rate
in m
3
/h
Max power consumed
in kW
Connection
Ø
GDJ 20
24
240
Rp 3/4”
GDJ 25
70
700
Rp 1”
GDJ 50
140
1400
Rp 2”
EH645
EH646
MC
A_Q0209
MC
A_Q0203
FUMI_F0216
Condensate draining
Condensate neutralisation station
Siphon