4.7.3.
Connecting the impressed current anode
1. Remove the inspection trap insulation.
2. Connect the connectors on the titanium anode cable.
3. Put the inspection trap insulation back in place, feeding the cables
into the notches.
4. Route the cable to the back of the tank.
5. Connect the titanium anode cable to the corresponding terminal
block on the boiler (Terminal TA-).
¼
See chapter: "Description of the boiler's terminal block",
4.7.4.
Description of the boiler's terminal block
n
Gas fired floor-standing condensing boiler
A
S.ECS
: Connect the DHW sensor.
Z
TA-
: Connect the DHW tank anode.
3
1
4
M002357-E
2
2
X20
X4
On
/o
ff
OT
BL
RL
S E
XT
S E
CS
1
2
TS +
B
A
B
0-1
0V
S AMB
C
4 3 2 1
2 1
+
-
S AMB
B
2 1
S AMB
A
2 1
S SYST
+ T
A -
S ECS
S EXT
S DEP C
2 1
2 1
2 1
2 1
2 1
S DEP B
2 1
PCU
SCU
C003904-A
4. Installation
160 SL
19
15/03/2012 - 300026901-001-C