Instruction
manual
Personnel lock system
Quick-Dush ECO-LINE
Seite 5
3 Transport
3.1 Delivery
Unless agreed otherwise, the lock system is packed completely and securely for
transport by deconta.
Transport damages have to be documented at once during the handing over of the
carrier or another supplier. Please note the possible damages additionally on the way bill.
3.2 Transport
A special transport rack for all single parts of the personnel lock system has been
developed for transport and storage.
To avoid damages caused by improper handling or carelessness, it is common practice
to handle the Transport with care.
3.3 Storage
The lock system may only be stored when decontaminated.
In order to avoid
damages, the installation has to be kept in a dry area with no access for unauthorized
persons.
4 Scope of delivery
The volume of delivery of a lock system, unless no other agreements have been made,
consists of:
• Personnel lock (number of chambers depending on the model)
•
Instruction
manual
optional
• Water treatment boiler system with integrated filtration system