Material lock system Quick-Dush 

 ECO-LINE 

 

 
Stand: Nov 2020 

Seite 7 

 

6 Technical data 

 

Dimensions: 

 
 
per chamber: 
 
interior (LxWxH): 

 

 

 

880 x 1780 x 2195 

 
exterior (LxWxH):   

 

 

900 x 1800 x 2230 

 
 

Water supply: 

 
Fresh water connection:   

 

3/4“ hose and GEKA connection 

      to 

roof 

element 

 
Sewage connection: 

 

 

3/4“ hose and GEKA connection 
to base element 

 

Options: 

 
- Side wall with hose connection flange 
- Extension and enlargement chambers 
- Roller track for transport of materials on pallet 
- Ramp for moving pallets with fork lift into lock system. 
 

 

Ramp 

Roller track 

Summary of Contents for ECO-Line

Page 1: ...Instruction manual Material lock system Quick Dush ECO Line Manufacturer deconta GmbH Im Geer 20 D 46419 Isselburg Descriptioin Materia lock system Quick Dush ECO LINE...

Page 2: ...vice 4 3 Transport and storage 5 4 Scope of delivery 5 5 Technical description 5 5 1 Intended use 5 5 2 Description of material lock system 6 6 Technical data 7 7 Assembly instruction 8 7 1 Preparatio...

Page 3: ...ecurity For your protection the use of the engineered equipment outside of the asbestos removal should be agreed upon beforehand with deconta It will be our pleasure to help and support you and will t...

Page 4: ...achine Necessary repairs maintenance and cleaning in particular in the field of electrical equipment should be realized by qualified staff or if necessary by the express service deconta in order keep...

Page 5: ...unauthorized persons 4 Scope of delivery Unless no other agreements have been made the scope of delivery of a material lock system consists of Guide book Material lock system Number of chambers accord...

Page 6: ...r elements out of recycled Excellent heat and cold resistance Easy cleaning of light coloured smooth surfaces Cleaning chamber with hand shower Floor grid in each chamber All door elements with ventil...

Page 7: ...H 900 x 1800 x 2230 Water supply Fresh water connection 3 4 hose and GEKA connection to roof element Sewage connection 3 4 hose and GEKA connection to base element Options Side wall with hose connecti...

Page 8: ...k Determine the exact position and the ground plan The floor must be clean and flat 7 2 Set up Align bottom elements flatwise next to each Attention To prevent unnecessary hose lengths the sewage aspi...

Page 9: ...of two base elements and brace quick release clamps fixed to the end of the corner profile to the base element Insert wall element in holder bracket and mount opposite corner profile ATTENTION Pay att...

Page 10: ...doors into holder bracket and fix to corner profile with quick release clamps Assemble other double door and the remaining wall elements as described above Put on the roof and brace quick release clam...

Page 11: ...stalled clamped with help of wing screws at the junction of both roof elements Place corner profile where both base elements adjoin each other This prevents a water discharge out of the lock system Mo...

Page 12: ...iculty in assembling the wall and the bottom element Corners of connection are dirty Clean holder bracket Difficulty in assembling the wall and the bottom element Corners of connection are bended Clea...

Page 13: ...Instruction manual Material lock system Quick Dush ECO LINE Stand Nov 2020 Seite 13 11 Notes...

Page 14: ...ion manual Material lock system Quick Dush ECO LINE Stand Nov 2020 Seite 14 12 Our Service for you Open Monday Thursday 8 00 16 30 Uhr Friday 8 00 15 30 Uhr Telephone 0 28 74 91 56 0 Telefax 0 28 74 9...

Reviews: