3 Transport and storage

 

 
Unless no other agreements have been made, the lock system has been packed 
adequately against damage and is delivered ex works deconta GmbH Isselburg. 
Transport damages have to be documented at once during the handing over of the 
carrier or another supplier. Please note the possible damages additionally on the way bill. 
 
To avoid damages caused by improper handling or carelessness, please be cautious 
during transport.

 

 
 
The lock system has to be put in store in a decontaminated condition. 
In order to avoid damages, the installation has to be kept in a dry area with no access for 
unauthorized persons. 
 
 

4 Scope of delivery 

 
Unless no other agreements have been made, the scope of delivery of a material lock 
system consists of: 
 
  • 

Guide 

book 

 

 

• Material lock system (Number of chambers according to design) 

 
optional 

• Sewage filtering plant 

 
 
 

5 Technical description 

 

5.1 Intended use 

 
In case of asbestos removal work within closed rooms, it has to be excluded that 
asbestos fibres leave the removal area uncontrolled and consequently would represent a 
danger for humans and environment. For these reasons, the removal area (dirty end) is 
separated from the clean area and kept thanks to a NPU (negative pressure unit) in 
dynamical negative pressure. 
The 

deconta

 Material lock system ECO-Line serves to move material inward and 

outward, as well as to clean asbestos contaminated material without endangering the 
environment. 

 
The Material lock system may not be used as Personnel lock system! 

Summary of Contents for ECO-Line

Page 1: ...Instruction manual Material lock system Quick Dush ECO Line Manufacturer deconta GmbH Im Geer 20 D 46419 Isselburg Descriptioin Materia lock system Quick Dush ECO LINE...

Page 2: ...vice 4 3 Transport and storage 5 4 Scope of delivery 5 5 Technical description 5 5 1 Intended use 5 5 2 Description of material lock system 6 6 Technical data 7 7 Assembly instruction 8 7 1 Preparatio...

Page 3: ...ecurity For your protection the use of the engineered equipment outside of the asbestos removal should be agreed upon beforehand with deconta It will be our pleasure to help and support you and will t...

Page 4: ...achine Necessary repairs maintenance and cleaning in particular in the field of electrical equipment should be realized by qualified staff or if necessary by the express service deconta in order keep...

Page 5: ...unauthorized persons 4 Scope of delivery Unless no other agreements have been made the scope of delivery of a material lock system consists of Guide book Material lock system Number of chambers accord...

Page 6: ...r elements out of recycled Excellent heat and cold resistance Easy cleaning of light coloured smooth surfaces Cleaning chamber with hand shower Floor grid in each chamber All door elements with ventil...

Page 7: ...H 900 x 1800 x 2230 Water supply Fresh water connection 3 4 hose and GEKA connection to roof element Sewage connection 3 4 hose and GEKA connection to base element Options Side wall with hose connecti...

Page 8: ...k Determine the exact position and the ground plan The floor must be clean and flat 7 2 Set up Align bottom elements flatwise next to each Attention To prevent unnecessary hose lengths the sewage aspi...

Page 9: ...of two base elements and brace quick release clamps fixed to the end of the corner profile to the base element Insert wall element in holder bracket and mount opposite corner profile ATTENTION Pay att...

Page 10: ...doors into holder bracket and fix to corner profile with quick release clamps Assemble other double door and the remaining wall elements as described above Put on the roof and brace quick release clam...

Page 11: ...stalled clamped with help of wing screws at the junction of both roof elements Place corner profile where both base elements adjoin each other This prevents a water discharge out of the lock system Mo...

Page 12: ...iculty in assembling the wall and the bottom element Corners of connection are dirty Clean holder bracket Difficulty in assembling the wall and the bottom element Corners of connection are bended Clea...

Page 13: ...Instruction manual Material lock system Quick Dush ECO LINE Stand Nov 2020 Seite 13 11 Notes...

Page 14: ...ion manual Material lock system Quick Dush ECO LINE Stand Nov 2020 Seite 14 12 Our Service for you Open Monday Thursday 8 00 16 30 Uhr Friday 8 00 15 30 Uhr Telephone 0 28 74 91 56 0 Telefax 0 28 74 9...

Reviews: