background image

     

 

 

9

 / 

10

 

 

WWW.DDTOP.COM 

5.2 Check the contents 

 

5.2.1 Check the appearance of the meter for defects, damage, etc. 

6 Installation 

6.1 Installation tools 

 

6.1.1 Wrenches, welding machines, etc. for process connections 

 

6.2 Methods of use and operating procedures - Figure 4

 

1

2

3

4

5

6

7

8

9

1

0

 

图 4 

 

1. After the installation of the equipment, the first thing is to check the equipment thoroughly and 
carefully. The liquid storage tank and pipeline should be purged and cleaned to prevent debris from 
entering the pipeline system. 
 
2.  When  filling  the  isolation  fluid,  connect  the  No.  10  isolation  fluid  tank  with  quick-change 
couplings as shown in Figure 4. Close valve 2 and slowly open valve 1. Slowly press the antifreeze 
solution into the reservoir with compressed air and close valve 1 when the demand is reached. 
 
3. Close valve 4 and open valve 3. Fill the tank proportionally with fresh water and open valve 2. Stir 
the solution with compressed air, and close valve 3. 
 

Summary of Contents for GLCG

Page 1: ...1 10 WWW DDTOP COM GLCG BUFFER BARRIER FLUID SYSTEM Operation Manual GLCG DT JS 1034 2019 A...

Page 2: ...nge without notice Dandong Top Electronics Instrument Group Co Ltd reserves the right to modify the products described in this manual at any time without notice Quality Assurance Dandong Top Electroni...

Page 3: ...rument Group Co Ltd has passed the ISO9001 quality system certification The whole production process is carried out in strict accordance with the provisions of the quality system to provide the strong...

Page 4: ...ct structure Figure 1 5 2 2 Operating Principle 6 2 3 Packaging 6 2 4 Lifting for transport 6 2 5 Storage 6 3 2 Main Technical parameters 7 4 Outline drawing 7 Figure 2 Outline drawing 8 5 Unpacking a...

Page 5: ...national standards codes and procedures Ensure that equipment is installed in accordance with intrinsically safe or non flammable site work procedures 1 2 Serious injury or death may result from proce...

Page 6: ...upporting 8 Glass tube level meter displaying the height of the isolated liquid level in the tank 9 Liquid storage tanks storage of isolation fluids 2 2 Operating Principle Buffer Barrier Fluid System...

Page 7: ...a 0 16MPa Outlet Flow Rate 125L h 160L h 200L h Tank Capacity 1 1 m3 Motor Power 2 2kW 4kW Power Supply 380VAC 50Hz System Material 304 4 Outline drawing GLCG 200 16 GLCG 200 16 200L h 200L h 0 16MPa...

Page 8: ...ecking 5 1 Precautions for unpacking inspection 5 1 1 Check whether the Product Name Plate Figure 3 is consistent with the information in the supply list Figure 3 Product Name Plate 5 1 2 Check whethe...

Page 9: ...ghly and carefully The liquid storage tank and pipeline should be purged and cleaned to prevent debris from entering the pipeline system 2 When filling the isolation fluid connect the No 10 isolation...

Page 10: ...quired pressure At this point you can open the valve 5 on the system for filling 5 During the summer months valves 3 and 5 can be closed and valve 4 opened to directly fill the system with fresh water...

Reviews: