background image

     

 

 

2

 / 

10

 

 

WWW.DDTOP.COM 

Preface 

 

Thank you for choosing the products of Dandong TOP Electrical Appliance (Group) Co. 

 

This instruction manual provides you with important information on installation, connection and 

commissioning as well as for maintenance, troubleshooting and storage. Please read it carefully 

before installation and commissioning and keep it close to the instrument as an integral part of the 

product, so that you can refer to it at any time. 

 

You can download this instruction manual by entering the version number at www.ddtop.com. 

 

If the instrument is not operated in accordance with these instructions, the protection provided by 

the instrument may be impaired. 

 

Trademark, Copyright and Restriction Instructions 

Dandong Top Electronics Instrument (Group) Co., Ltd.®, Dandong Top Pump Co., Ltd.®, DDTOP® 

are registered trademarks of the company. 

 

The performance specifications of this instrument are effective from the date of publication and are 

subject to change without notice. Dandong Top Electronics Instrument (Group)Co.,Ltd. reserves the 

right to modify the products described in this manual at any time without notice. 

 

Quality Assurance 

Dandong Top Electronics Instrument (Group) Co., Ltd. guarantees all LBTC Positive Displacement 

Rotary Vane Flow Meter to be free from defects in materials and manufacturing processes within 

one year from the date of delivery. 

 

During the warranty period, Dandong Top Electronics Instrument (Group) Co., Ltd. is responsible for 

repairing or replacing the equipment free of charge for the buyer (or owner) if the product is 

returned with quality problems and the claim made is determined to be covered by the warranty 

after inspection by the manufacturer. 

 

Dandong Top Electronics Instrument (Group) Co. Ltd. shall not be liable for improper use of the 

equipment, labor claims, direct or subsequent damage, or costs arising from the installation and use 

of the equipment. Dandong Top Electronics Instrument (Group) Co., Ltd. does not provide any 

warranty, either express or implied, except for special written warranty certificates for certain 

products of Dandong Top Electronics Instrument (Group) Co., Ltd. 

 

Summary of Contents for GLCG

Page 1: ...1 10 WWW DDTOP COM GLCG BUFFER BARRIER FLUID SYSTEM Operation Manual GLCG DT JS 1034 2019 A...

Page 2: ...nge without notice Dandong Top Electronics Instrument Group Co Ltd reserves the right to modify the products described in this manual at any time without notice Quality Assurance Dandong Top Electroni...

Page 3: ...rument Group Co Ltd has passed the ISO9001 quality system certification The whole production process is carried out in strict accordance with the provisions of the quality system to provide the strong...

Page 4: ...ct structure Figure 1 5 2 2 Operating Principle 6 2 3 Packaging 6 2 4 Lifting for transport 6 2 5 Storage 6 3 2 Main Technical parameters 7 4 Outline drawing 7 Figure 2 Outline drawing 8 5 Unpacking a...

Page 5: ...national standards codes and procedures Ensure that equipment is installed in accordance with intrinsically safe or non flammable site work procedures 1 2 Serious injury or death may result from proce...

Page 6: ...upporting 8 Glass tube level meter displaying the height of the isolated liquid level in the tank 9 Liquid storage tanks storage of isolation fluids 2 2 Operating Principle Buffer Barrier Fluid System...

Page 7: ...a 0 16MPa Outlet Flow Rate 125L h 160L h 200L h Tank Capacity 1 1 m3 Motor Power 2 2kW 4kW Power Supply 380VAC 50Hz System Material 304 4 Outline drawing GLCG 200 16 GLCG 200 16 200L h 200L h 0 16MPa...

Page 8: ...ecking 5 1 Precautions for unpacking inspection 5 1 1 Check whether the Product Name Plate Figure 3 is consistent with the information in the supply list Figure 3 Product Name Plate 5 1 2 Check whethe...

Page 9: ...ghly and carefully The liquid storage tank and pipeline should be purged and cleaned to prevent debris from entering the pipeline system 2 When filling the isolation fluid connect the No 10 isolation...

Page 10: ...quired pressure At this point you can open the valve 5 on the system for filling 5 During the summer months valves 3 and 5 can be closed and valve 4 opened to directly fill the system with fresh water...

Reviews:

Related manuals for GLCG