日 期/ 编 号

丹 东 通 博 电 器 ( 集 团 ) 有 限 公 司

G L C G - 2 0 0 /16

G L C G - 2 0 0 /16

出口 流量

2 0 0 L /h

2 0 0 L /h

出口 压力

0 - 1 6 M Pa

0 - 1 6 M Pa

电机 电压 / 功率

3 8 0 V A C / 4 . 0KW

3 8 0 V A C / 4 . 0KW

储 罐容 量

1 . 1 m3

1 . 1 m3

防 爆等 级

E x d

E x d ⅡC T 4

C T 4

3 0 4

3 0 4

隔 离液 充 灌装 置

1

2

3

4

5

6

7

8

9

 

Figure 1 

1. Inlet flanges: connecting to the air and water pipes of the device separately. 

2. Outlet flanges: connecting to piping to be filled 

3. Relief valve: stabilizing pressure and preventing overload to ensure constant export pressure. 

4. Pressure gauge: indicating the change in outlet pressure.   

5. Metering pumps: pressurizing and delivering isolation fluid. 

6. Filter: filtering impurities from storage tanks 

7. Base frame: fixing and supporting 

8. Glass tube level meter: displaying the height of the isolated liquid level in the tank. 

9. Liquid storage tanks: storage of isolation fluids 

2.2 Operating Principle 

Buffer/Barrier Fluid System is mainly composed of isolated fluid storage tank, level gauge, filter, 

metering pump and various valves, etc. The device is pressurized by metering pump to deliver the 

isolated fluid in the storage tank to the process device, to achieve antifreeze and cleaning effect and 

ensure the continuous and stable operation of the process device.

 

2.3 Packaging 

Please take the packaging waste to a special recycling facility. 

2.4 Lifting for transport 

Please use qualified lifting equipment and lifting straps, and pay attention to safety. 

2.5 Storage 

Storage temperature -20℃~40℃; storage humidity≤20%. 

Summary of Contents for GLCG

Page 1: ...1 10 WWW DDTOP COM GLCG BUFFER BARRIER FLUID SYSTEM Operation Manual GLCG DT JS 1034 2019 A...

Page 2: ...nge without notice Dandong Top Electronics Instrument Group Co Ltd reserves the right to modify the products described in this manual at any time without notice Quality Assurance Dandong Top Electroni...

Page 3: ...rument Group Co Ltd has passed the ISO9001 quality system certification The whole production process is carried out in strict accordance with the provisions of the quality system to provide the strong...

Page 4: ...ct structure Figure 1 5 2 2 Operating Principle 6 2 3 Packaging 6 2 4 Lifting for transport 6 2 5 Storage 6 3 2 Main Technical parameters 7 4 Outline drawing 7 Figure 2 Outline drawing 8 5 Unpacking a...

Page 5: ...national standards codes and procedures Ensure that equipment is installed in accordance with intrinsically safe or non flammable site work procedures 1 2 Serious injury or death may result from proce...

Page 6: ...upporting 8 Glass tube level meter displaying the height of the isolated liquid level in the tank 9 Liquid storage tanks storage of isolation fluids 2 2 Operating Principle Buffer Barrier Fluid System...

Page 7: ...a 0 16MPa Outlet Flow Rate 125L h 160L h 200L h Tank Capacity 1 1 m3 Motor Power 2 2kW 4kW Power Supply 380VAC 50Hz System Material 304 4 Outline drawing GLCG 200 16 GLCG 200 16 200L h 200L h 0 16MPa...

Page 8: ...ecking 5 1 Precautions for unpacking inspection 5 1 1 Check whether the Product Name Plate Figure 3 is consistent with the information in the supply list Figure 3 Product Name Plate 5 1 2 Check whethe...

Page 9: ...ghly and carefully The liquid storage tank and pipeline should be purged and cleaned to prevent debris from entering the pipeline system 2 When filling the isolation fluid connect the No 10 isolation...

Page 10: ...quired pressure At this point you can open the valve 5 on the system for filling 5 During the summer months valves 3 and 5 can be closed and valve 4 opened to directly fill the system with fresh water...

Reviews:

Related manuals for GLCG