
3
19549P-31 (04-17)
2. Mounting the Master Station
Parts/Tools Required
q
U9100 Series Digital Intercom System Master Station (44000G-01)
q
M9100RM Rack-Mount Kit (44004G-01, optional)
q
Pencil/Pen
q
Drill
q
13/32-inch Drill Bit
q
#8 Mounting Screws (customer supplied)
q
Nuts (customer supplied)
q
Lock-washers (customer supplied)
Procedure
Location Considerations
Select a location on a flat surface that is out-of-the-way, and provides adequate room to attach all
cables. The Master Station is immersion-proof (IP67). However the mounting location should be
chosen to minimize direct exposure to the elements.
Alternately, the Master Station may be rack-mounted as a 4U in a EIA-310 standard 19-in. rack
with the optional rack-mount kit (M9100RM, 44004G-01).
Mounting
q
Position the Master Station on the surface to be mounted and mark the (4) hole locations.
q
Drill the (4) holes with 13/32-inch drill bit.
q
Mount the endpoint with #8 mounting screws and nuts/lock-washers (customer supplied).
Summary of Contents for 9100 SERIES
Page 2: ...19549P 31 04 17 ...
Page 30: ...25 19549P 31 04 17 Figure 8 13 Map Devices ...
Page 36: ...31 19549P 31 04 17 Figure 8 15 Talk Group Example 3 Radio ...
Page 38: ...33 19549P 31 04 17 Figure 8 16 Talk Group Example 4 Intercom ...
Page 39: ...34 19549P 31 04 17 Figure 8 17 Talk Group Example 4 Radio 1 ...
Page 40: ...35 19549P 31 04 17 Figure 8 18 Talk Group Example 4 Radio 2 ...
Page 42: ...37 19549P 31 04 17 Figure 8 19 Talk Group Example 5 Left ...
Page 43: ...38 19549P 31 04 17 Figure 8 20 Talk Group Example 5 Right ...
Page 44: ...39 19549P 31 04 17 Figure 8 21 Talk Group Example 5 Mic ...
Page 45: ...40 19549P 31 04 17 Figure 8 22 Talk Group Example 5 PTT ...
Page 47: ...42 19549P 31 04 17 Figure 8 23 Talk Group Example 6 External Intercom ...