6
PLACE SKELETON ON FLOOR BASE & PREPARE UNIT FOR PANELS
3
4
- Place the leveling glides of the
Vertical Posts into the outer
holes of the floor base.
- Raise the post by lowering the
leveling glide of any corners
that had to be elevated with
spacers (Refer to Step )
3.a
3.b
INSTALL POWER SOURCE CABLE IN TECH PANEL IF POWER IS COMING FROM THE
FLOOR
(DISREGARD IF POWER SOURCE IS OUTSIDE THE CUBE)
Insert and feed the GST
end of the cable up the
conduit from the bottom
of the panel.
APPROX 33FT LONG
BOTTOM
TOP
GST
3 PIN
GST
3 PIN
1.b
Use the 13mm Flat Wrench to loosen/tighten the leveling glides
Adjusting Leveling Glides:
Loosening the leveling glides will
RAISE
the post.
Tightening the leveling glides will
LOWER
the post.
Summary of Contents for PHONE CUBE