background image

2

TOP TRAVERSE BEAMS

VERTICAL POSTS

SQUARE FLOOR BASE

MAIN ELEMENTS OF SKELETON FRAME:

STANDARD PHONE CUBE PANELS:

TECH ACOUSTIC PANEL

(DESK|POWER)

GLASS DOOR 

GLASS PANEL

STANDARD

ACOUSTIC PANEL

Fabric faces are applied to both sides of each Acoustic Panel

Tech Panel includes a conduit for power wiring to go through and T-nuts for the Desk installation

Summary of Contents for PHONE CUBE

Page 1: ......

Page 2: ...TS AND LOCK NUTS TO SECURE DESK TO PANEL RUBBER MALLET FOR INSERTING PANELS 1 8 DRILL BIT FOR DOOR CORNER SQUARE TO ALIGN FRAME FLAT PALLET KNIFE TO FACILITATE PANEL INSTALL SPIRIT LASER LEVEL TO LEVEL THE UNIT CLAMPS TO FACILITATE PANEL INSTALL AND PLACING POST 13 13MM FLAT WRENCH FOR LEVELING THE GLIDES OF 8MM HEX BIT WITH EXTENSION FOR HEX BOLT SCREWS 6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD ...

Page 3: ...LETON FRAME STANDARD PHONE CUBE PANELS TECH ACOUSTIC PANEL DESK POWER GLASS DOOR GLASS PANEL STANDARD ACOUSTIC PANEL Fabric faces are applied to both sides of each Acoustic Panel Tech Panel includes a conduit for power wiring to go through and T nuts for the Desk installation ...

Page 4: ...out must be installed on the desk power side One of the top traverse beams in each size 1026 and 1028 will have a cutout for power wiring to go through this beam and the Tech panel The Desk and Power Tech Panel is commonly installed on the side adjacent to the door hinges left side but can also be installed on the rear or the right side LOCATION OF THE TECH PANEL FOR DESK AND POWER POWER CUTOUT IN...

Page 5: ...asurement of how much the corner post s will need to be raised Then remove the spacers COUNTERSINK FACE UP 1 LOCATE WHERE PHONE CUBE IS TO BE INSTALLED AND CHECK FLOOR LEVEL 4 Lay down the square floor base in the exact desired location for the Phone Cube Use the floor frame to check if the floor is level 1 a 1 b ...

Page 6: ...8mm beams ASSEMBLE THE SKELETON FRAME DO NOT TIGHTEN SCREWS ALL THE WAY TOP TRAVERSE BEAMS TO VERTICAL POSTS CONNECTION DETAIL 2 DO NOT FULLY TIGHTEN SCREWS Screws will be tightened firmly later at Step B B A A A A B B TOP TRAVERSE BEAMS TOP VIEW The screw plates go IN the vertical post A Ratchet with 5mm hex bit is used to assemble the TRAVERSE Beam 8 2 a 2 b 2 c TRAVERSE BEAM WITH CUTOUT TRAVERS...

Page 7: ...p 3 a 3 b INSTALL POWER SOURCE CABLE IN TECH PANEL IF POWER IS COMING FROM THE FLOOR DISREGARD IF POWER SOURCE IS OUTSIDE THE CUBE Insert and feed the GST end of the cable up the conduit from the bottom of the panel APPROX 33FT LONG BOTTOM TOP GST 3 PIN GST 3 PIN 1 b Use the 13mm Flat Wrench to loosen tighten the leveling glides Adjusting Leveling Glides Loosening the leveling glides will RAISE th...

Page 8: ... from inside 4 5 PER STEP Insert the Tech Panel from the bottom on an angle Do not fully tighten the screws Repeat 5 a 5 c for all Panels Firmly tighten all panels once the panels and leveling glides are in their correct locations If necessary use a flat pallet knife to push in the rubber gaskets 5 a USE 8MM HEX BIT WITH EXTENSION 5 d 5 b 5 c ...

Page 9: ...HE DOOR PANEL 6 Cut pull out the plastic strips once the door frame is installed USE 8MM HEX BIT WITH EXTENSION INSTALL THE DOOR PANEL Remove the door handle package DO NOT REMOVE Black Plastic Strips They keep the door glass panel in the door frame Unscrew the leveling glides to remove the protective piece of wood from the bottom of the door Screw the leveling glides back into the insert of the g...

Page 10: ... Door Panel Incorrectly Leveled Glass Door Panel 9 CHECK DOOR FITTING Insert all glides into their respective countersink holes If necessary use a 48 clamp from post to post to adjust the corner leveling glides 8 c Click Check that the door latch clicks when closing the door 9 a 9 b 8 a 1 4 Gap The front post leveling glides should be adjusted to go into their respective holes 8 b Uneven Door Gap ...

Page 11: ... through the vertical post of the skeleton frame Install the screws provided Cover the holes with the provided covers Test the door latch again after installing these screws and ensure it clicks when closing the door x3 SECURE THE DOOR PANEL 10 IMPORTANT The glass door frame should have been checked before this point Please refer to Step on Pg 9 9 ...

Page 12: ...down to secure connection Insert the connected wiring into the hole so the LED light can lay flushed against the ceiling Place the LED light on the ceiling and center unit with the hole CONNECT LED LIGHT TO CEILINGS 11 CAUTION Ensure correct polarity White Positive Black Brown Red Negative Ceiling negative wire LED negative wire Already connected 24 V DC IMPORTANT Ensure to the correct polarity of...

Page 13: ... into the top traverse beams in the locations circled in the image to the right INSTALL THE ROOF 13 Place the roof on top of the structure Occupancy Sensor Feed the FEMALE GST end of the cable from the top down through the cutout of the top traverse beam into the conduit and out of the hole in the tech panel GST TO GST 6FT CABLE MALE GST FEMALE GST INSTALL WIRING FOR DESK POWER IN TECH PANEL 12 MA...

Page 14: ... GST cable from the power unit with the GST cable from the panel Secure with lock nuts provided Screw the threaded rods provided in the Desk Kit into the tech panel Install the desk onto the threaded rods on the tech panel INSTALL DESK ONTO TECH PANEL 14 INSTALL POWER UNIT IN DESK 15 14 a 14 b 15 a 15 b ...

Page 15: ...ion 3 PIN IF POWER FROM THE FLOOR IF POWER FROM THE CEILING DESK POWER MALE MALE FEMALE POWER SOURCE VENTILATION SYSTEM GST TRIPLE TAP EXTENSION CONNECT ALL WIRING 16 3 PIN Female GST Phone Cube Control Box 3 Pin Plug Connect to Power Source Desk Power Desk Power Connect to Power Source 6 Ft 33 Ft ...

Page 16: ...n insert the smaller rectangular pair onto each side of the bottom of the door frame Some irregular floors might require foam filler strips under all 3 panels with exception of the door 17 USA 100 Fulton Street Boonton NJ 07005 TEL 800 631 1186 FAX 800 220 3844 EMAIL info dauphin com WEB dauphin com CB1x1 03 13 19 ...

Reviews: