Revision No. 005 August 2020
DataRemote 2020
PREP-INSTALLATION TASKS.
On-site Arrival and Initial Equipment Testing:
1. Upon arrival, call your respective Program Manager on the check-
in line to confirm that you
are on-site and be prepared to supply the Store #Number/ Location ID & City/ST listed on
your Work Order
2. Ask for the Manager On Duty (MOD) and introduce yourself with the purpose of your visit as
the installer for the DataRemote DRI-9080 device.
a. Please report any store access issue to your Project Manager immediately
3. If the DataRemote DRI-9080 device was shipped to the site in advance of your dispatch;
please obtain this package from the Manager.
a.
IMPORTANT: Please open the package in front of MOD and inspect for a
complete kit per the previous page's Material's List; especially if package
was already opened when it was given to you
b. Report any missing equipment immediately to Project Manager.
4.
IMPORTANT: Any directives from on-site store personnel deviating from the norm or
outside the scope of this guide must be relayed to the PM immediately. If you
encounter a problem in the field which requires escalation, please contact the
Project Manager immediately (bottom line, contact Project Manager for approval
prior to accepting and acting upon any direction from store personnel on-site).
Please review these steps before starting and ensure you bring a
printed copy of this guide and Installation Checklist to the site, to
use it as a reference during the installation.
Page 11