
64
The reserved key <F2> will bring out this menu from any menu and any time.
File / Load project
This option is used for loading project file, which contains device configuration buffer data
saved and user interface configuration.
The standard dialog Load project contains additional window - Project description - placed
at the bottom of dialog. This window is for displaying information about currently selected
project file in dialog Load project.
Project information consists of:
manufacturer and name of the first device selected in the project
date and time of project creation
user written description of project (it can be arbitrary text, usually author of project and some
notes)
Note: For projects with serialization turned on.
Serialization is read from project file by following procedure:
Serialization settings from project are accepted
Additional serialization file search is performed. If the file is found it will be read and
serialization settings from the additional file will be accepted. Additional serialization file is
always associated to the specific project file. When additional serialization file settings are
accepted, project serialization settings are ignored.
Name of additional serialization file is derived from project file name by adding extension ".sn"
to project file's name.
Additional serialization file is always placed to the directory "serialization\" into the control
program's directory.
Example:
Project file name: my_work.prj
Control program's directory: c:\Program Files\Programmer\
The additional serialization file will be:
c:\Program Files\Programmer\serialization\my_work.prj.sn
Additional serialization file is created and refreshed after successful device program operation.
The only requirement for creating additional serialization file is load project with serialization
turned on.
Command File / Save project deletes additional serialization file, if the file exists, associated
with currently saved project.
Enter job identification dialog
The dialog will be showed when loading protected project files.
Summary of Contents for 448PRO2AP
Page 6: ...6 Introduction ...
Page 11: ...DATAMAN 448PRO2AP AU 11 DATAMAN 448PRO2AP AU ...
Page 19: ...DATAMAN 448PRO2AP 19 DATAMAN 448PRO2AP ...
Page 26: ...26 DATAMAN 48PRO2AP ...
Page 33: ...Setup 33 Setup ...
Page 38: ...38 Step 8 Installation process will start Step 9 Click Finish button to finish setup ...
Page 56: ...56 PG4UW ...
Page 123: ...PG4UWMC 123 PG4UWMC ...
Page 136: ...136 Installation procedure customized ...
Page 145: ...Common notes 145 Common notes ...
Page 157: ...Troubleshooting and warranty 157 Troubleshooting and warranty ...