Finishing a Job ■ Turning PSV5000 System Power OFF
- 74 -
Data I/O ■ 096-0466-001E
Finishing a Job
After a job completes:
1.
Wait for the PNP head to park.
2.
(Optional) If Sort-On-Error-Code was employed, record the number of
devices in Reject 1, (FailBox1).
3.
Empty the reject container(s).
4.
Remove programmed devices.
Turning PSV5000 System Power OFF
When the PSV5000 System will not be run overnight, or before performing a
service procedure, turn OFF the power.
1.
Finish or end the job if one is running.
2.
Remove all devices from the workspace.
CAUTION:
Possible damage to programmers and devices!
DO NOT TURN POWER OFF to the programmers or to the
PSV5000 Machine while a job is running. A job must be Finished before
turning programmer power OFF. Wait for the gantry to park before
turning machine power OFF.
3.
At the Handler PC:
exit CH700 and TaskLink,
and TURN OFF THE
HANDLER COMPUTER
WITH THE WINDOWS
Start MENU.
CAUTION:
Possible loss of data or difficult restart! DO NOT
TURN PSV5000 POWER OFF before shutting down the Handler PC.
Ensure the monitor is dark (and not just asleep) and any optional PCs
are shut OFF prior to cutting power to the PSV5000 Machine.
4.
[
Laser Marker System only]
a.
(Optional) Save and exit the Laser Marker software.
b.
Push the RED LIGHT switch OFF [0].