
Page 6 of 17
2.2 Pre-Installation Responsibilities and component packing list
This document is a guide to the steps that need to be performed to correctly install
the SL720 Flexible Mobile Minor Surgical light. However, the work required to be
performed is the responsibility of the owner or designated contractor/s.
All fixings between DARAY lights and the building super-structure must be approved
by either the chief project engineer or an appropriate and competent structural
assessor.
The components supplied by DARAY for fitting / installation should be the following
items in the specified quantities.
SL720LFM
Qty.
IEC Cable (5m Orange)
1
Mobile Base
1
Light head and upstand assembly
1
Bag of fixings
1
Microfibre cloth
1
User Manual & Assembly Guide
1
2.3 Pre-Start Checks
Please check that the power cable is without visible damage, harsh folds, knots or
cuts in the rubberised coating.
When applicable, please check that the cable is fully inserted into the power socket,
before switching the power on.
Please check that the head and all parts of the base are without visible damage.
Summary of Contents for SL720
Page 1: ...SL720 LED Mobile Minor Surgical Light Operating Installation Manual QAM SL720LFM 0219 4...
Page 2: ...Page 1 of 17...
Page 17: ...Page 16 of 17 Service Notes...
Page 18: ...Page 17 of 17...
Page 19: ...Page 18 of 17...