17
EDGE EBS-2
Product code: D1480B
Power Linking of Multiple Devices
This receiver supports power linking. Power can be relayed to another receiver via the 12–15 V DC power
connector OUT (19).
Power linking of multiple devices must be carried out only by instructed or skilled persons.
To prevent overload of the electrical circuit, when power linking multiple devices:
Use cables with sufficient current-carrying capacity. The power adapter supplied with the device is
not suitable for power linking of multiple devices.
Make sure that the total current draw of the device and all connected devices does not exceed the
rated capacity of the power adapter, power cables and the circuit breaker.
Do not link more devices on one power link than the maximum recommended number.
Setup Example
It is possible to connect up to 8 receivers and 16 transmitters and to install accessories. See 3.5. Optional
Accessories on page 11 for more information.
The unidirectional/omnidirectional antennas receive the signal from the transmitter(s) and send it to the
first receiver. The first receiver sends the signal to the other connected receivers.
Connect the 12–15 V DC BNC cascade connectors (12/21) of the first receiver to the 12–15 V DC BNC
connectors (08/11) of the second receiver. Repeat this step to connect multiple receivers as shown in
Fig. 14.
The unidirectional/omnidirectional antennas are not supplied with the device. See 3.5. Optional
Accessories on page 11.
Fig. 14
Summary of Contents for EDGE EBS-2 V2
Page 13: ...12 EDGE EBS 2 Product code D1480B Dimensions Fig 08...
Page 34: ...33 EDGE EBS 2 Product code D1480B...
Page 35: ...34 EDGE EBS 2 Product code D1480B...
Page 36: ...2023 DAP...