6
8. Remove the pedestal basin (
A
) from the ped-
estal column (
B
) and set both pieces aside while
installing the anchoring hardware.
9. Drill ¼” holes in the finished wall on the
pencil
marks indicating the wall anchor hole location.
Install the wall anchor bolts (
E
) in the finished
wall leaving approximately 1½” of the wall an-
chor bolts (
E
) exposed.
10. Drill ³/
16
” hole in the floor on the
pencil
marks
indicating the pedestal column floor anchor hole
location.
11. Assemble the faucet and drain (not included)
in the pedestal basin (
A
) according to the manu-
facturer’s recommendations.
12. Move the pedestal column (
B
) back into po-
sition aligning the base with the
pencil
mark on
the floor.
13. Set the pedestal basin (
A
) into the proper
position on the pedestal column (
B
). Align the
holes in the back wall of the pedestal basin (
A
)
with the wall anchor bolts (
E
).
2. Place the pedestal column (
B
) close to the fin-
ished wall in the intended installation location.
3. Place the pedestal basin (
A
) onto the pedestal
column (
B
). Adjust the pedestal basin (
A
) posi-
tion so that it sits evenly on the pedestal column
(
B
).
4. Carefully slide the assembled pedestal lava-
tory up against the finished wall. Make sure the
back wall of the pedestal basin (
A
) is flush with
the finished wall.
5. Check the top of the pedestal basin (
A
) for
level front to back and side to side. Additional
cork pads (
G
) are provided to aid in leveling the
pedestal basin (
A
) if necessary.
6. Use a
pencil
to lightly mark the location of
the wall anchor holes in the back of the pedestal
basin (
A
) onto the finished wall.
7. Use a
pencil
to lightly mark the location of the
pedestal column base and the pedestal column
floor anchor hole onto the floor.