background image

Oilburner

Type Gulliver RG3

Page 6 of 9

Adjustment

K:\framen\instrukt\Dantherm\RG\Engelsk\RG3\RG3.fm-I1-021108-DM/lbk

Accessibility to the nozzle:

Remove nozzle-holder assembly (1) after
loosing screws (2) and nut (3), remove the
small cables (4) from the control box, the
photoresistance (6).

Withdraw the small cables (4) from the
electrodes, remove the diffuser disc-hol-
der assembly from the nozzle-holder as-
sembly (1) after loosing screw (3, fig. 2).

Learn the diffuser disc-holder assembly
(1) on the nozzle-holder (2) and lock it by
screw (3).

For prospective adjustments of the eletro-
des assembly, loosen screw (4).

Combustion head setting:

It depends on the output of the burner
and is carried out by rotating clockwise
or counterclockwise the setting screw (5)
until the set-point marked on the regula-
ting rod (9) is level with the outside plane
of the nozzle-holder assembly (1).

In the sketch the combustion head is set
for an output of 2,25GPH at 12 bar.
The set-point 3 of the regulating rod(9) is
at the same level with the outside plane
of the nozzle-jolder assembly (1) as
shown in the schedule.

Air damper adjustment

To vary the setting adjust the screw (7)
after loosing the nut (8).

Fig. 1

Fig. 2

Summary of Contents for Gulliver RG3

Page 1: ...Oilburner RG3 GB Code No 970929...

Page 2: ...instruction should be kept in the furnace room The user is responsible for the burners working order and that the following points are observed Regulations The furnace room and the room containing th...

Page 3: ...W Capasitor 6 3 F Ignition transformer Secondary 8 kV 16 mA Control box 550 SMD Pump capacity Max 30 kg h at 10 bar Pump pressure 8 15 bar Approval MK 10 10 1255 1 Oil pump 2 Control box 3 Reset butto...

Page 4: ...on chamber Po Technical instructions Capacity diagram start up cycle K framen instrukt Dantherm RG Engelsk RG3 RG3 fm T2 021108 DM lbk Burner start up cycle Thermostat Motor Ignition transformer Valve...

Page 5: ...he by pass screw 3 and then screw again the plug 2 It is sufficient to loosen the suction gauge con nection 5 and wait until oil flows out It is neccesary to install a filter on the fuel sup ply line...

Page 6: ...on the oil supply pipes position to the right or to the left hand side of the burner One line system On the tank installa tion where vacuum can occur in the oil tubes you install a flow control betwee...

Page 7: ...to the arrow direction after removing all components the 7 pin plug and earth wire Ignition transformator The ignition transformator is build in in the control box The ignition cables are con nected t...

Page 8: ...ozzle holder 2 and lock it by screw 3 For prospective adjustments of the eletro des assembly loosen screw 4 Combustion head setting It depends on the output of the burner and is carried out by rotatin...

Page 9: ...ended Delavan Type W B Danfoss Type S B Monarch Type R Steinen Type S Q K framen instrukt Dantherm RG Engelsk RG3 RG3 fm I2 021108 dm lbk Adjustment Nozzle Pump pressure Burner output Combustion head...

Page 10: ...Oilburner Type Gulliver RG3 Page 8 of 9 Electrical wiring K framen instrukt Dantherm RG Engelsk RG3 RG3 fm E1 021108 dm lbk...

Page 11: ...ver 11 80007458 Viewing port 12 80007644 Bracket and screw 13 80000443 Joint 14 80007465 High voltage lead 15 80007651 Suction duct 16 80007466 Support 17 80007645 Diffuser disc 18 80007495 Electrode...

Reviews: