3. INSTALLATION
11
3.3 Installation and connection of components
All components and duct work of the air handling unit must be installed correctly before starting
up and commissioning the DanX unit.
Installation and connection work should only be carried out by trained specialists
or by people
supervised by authorized staff. It is the responsibility of the fitter to read and understand this
guide and other given information.
3.3.1 Cooling circuit XWPRS 16/32
Because of the weight of the cooling section, the XWPRS 16/32 is delivered in two parts. This
means that the cooling circuit first has to be connected before the compressor can be started
up. To connect the cooling circuit the following has to be done:
•
Take the three copper pipes for the cooling circuit (A/B/C) out of the box which is inside
the XWPRS module.
•
Check that the pipes are totally clean before installation.
•
Install the three pipes at each end of the cooling circuit after the shoot off valves (see
drawing)
•
Open for all six shoot off valves and check that the connections a tied with no refrigerant
leakage.