3. INSTALLATION
12
3.3 Installation and connection of components
All components and duct work of the air handling unit must be installed correctly before
starting up and commissioning the DanX unit.
Installation and connection work should only be carried out by trained specialists
or by
people supervised by authorized staff. It is the responsibility of the fitter to read and
understand this guide and other given information.
3.3.1 XWPS drop bridge
To avoid condensate leaving the unit through the module joint, a bridge must be mounted
between the two drip trays of the modules. This bridge is delivered separately and should be
mounted when the modules are in place.
•
Place a strip of sealing on the backside of the bridge (Detail C)
•
Turn over the bridge and place it between the two drip trays with the sealed side
facing the drop catcher.
•
If the sealing should not be enough to keep the bridge in place, it is possible to fasten
the two ends of the bridge to the module frame with two rived nuts (Detail B).
It is important that the drop bridge is installed and sealed correctly, to avoid uncontrollable
discharge of condensed water and water damage of the building!
Summary of Contents for DanX 2/4 XKS
Page 2: ......