
2.6 REGULAR PLANNED MAINTENANCE
Operations to be carried out during a regular planned maintenance visit are
as follows:
1) Clean or replace filters as applicable. (This action may be required more
frequently than regular servicing.
2) Check operation and condition of all fans and compressors.
3) Check capacitor tolerances (where fitted).
4) Check condition of all heat exchangers/evaporators.
5) Check refrigeration system parameters.
6) Check operation of control valves.
7) Check for water leaks.
8) Check drip trays and internal drain lines for blockages and clear.
9) Check operation of controls and calibrate as necessary.
10) Check operation of interlocks in use.
11) Final check on overall operation of unit.
12) Indicate on report any faults found or causes for concern.
Frequency recommended Light to medium use
1 visit per year
Heavy use
2 visits per year
24
SD611250 ISSUE 8
AA300AVH/AA500AVH TECHNICAL MANUAL
Summary of Contents for Calorex AA300AVH
Page 1: ...AA300AVH AA500AVH Owner installation manual SD611250 issue 8...
Page 2: ...2 SD611250 ISSUE 8 AA300AVH AA500AVH TECHNICAL MANUAL...
Page 21: ...COMPRESSOR CONTACTOR SEE BELOW FAN RELAY SEE BELOW R01 R02 R03 R04 R05 19 SD611250 ISSUE 8...
Page 23: ...ELEC CONTROL POWER CIRCUIT AA AIR LPHW CONTINUED R01 R02 R04 R03 R06 R05 21 SD611250 ISSUE 8...
Page 34: ...34 SD611250 ISSUE 8 AA300AVH AA500AVH TECHNICAL MANUAL...
Page 35: ...35 SD611250 ISSUE 8...