05776-1198 <90-00124>
P
AGE
15
37.
Hang up the handset and Pins 39 and 40 should go open.
Use the other terminal 46105 and repeat the process for Channel 2
and check Pins 7 and 8.
38.
End of 46105 Alignment Procedure.
ALIGNMENT PROCEDURES
OPERATION
O
peration of the 05776 Universal Order Wire shelf, when
used in conjunction with a 05775 Speaker Panel is simple
and straight-forward. Use the steps below.
1.
An 05775 Speaker panel will connect to the 05776 Universal OW
assembly using an 8 conductor RJ 45 connector that has male
connectors on each end. The cable must be straight through with
no nulls in it. The connector will connect between RJ 1 of the OW
assemblies and RJ 1, RJ 2 or RJ 3 of the speaker/monitor panel.
2.
Remove the handset with the appropriate button selected for the
OW that is going to be seized.
3.
The LED on the associated button on the 05775 will light indicating
that the unit is seized.
4.
If the OW unit is equipped with a 46105 module, the M lead will
turn on and the 46105 will be activated. The 46105 module will
convert the analog signal from the OW user to a 64Kb RS-422 syn-
chronous digital signal and convert a 64Kb digital signal back into
an analog VF signal for the OW.
5.
When the handset is off hook, the local speaker for the associated
OW will turn off and you can call whoever you need to call. Addi-
tionally, DTMF tones can be sent to activate the VNET Off-Net
PBX interface.
6.
When the bridge is used in the application, ports 1, 2, and 3 of the
bridge will transmit what the OW user is saying, or any DTMF
tones that are being sent.
7.
When a remote OW user answers, he will pick up his handset and
conversation can take place over the handsets.