
D4-9 / D4-9X Four-Post Lifts
35
P/N 5900251 — Rev. A1— August 2021
Important
:
Make sure to route each Lifting Cable correctly. If you route a Lifting Cable to the
wrong Post, it will either be too short or too long. If this happens, check to see where
the Lifting Cable is supposed to go and then route it there. As a general rule, there
should be about
1 inch
of threads above the Top Cap when you put the Lifting
Cable in place. If there is significantly less or more, you have the wrong cable.
The following drawing shows how Lifting Cables are routed to the top of their Posts.
View is from the inside of the Lift. Not to scale. Not all components shown.
We recommend routing Cables A and C together first, and then Cables B and D.
To route the Lifting Cables
:
1.
Locate the shortest Lifting Cable, Cable A, and the second longest Lifting Cable, Cable C.
Check the label to make sure you have the correct Lifting Cable.
2.
Make sure the Nut has been removed from the Threaded end of both Lifting Cables (the Nut
cannot be on during routing, but keep it nearby, you will need it again soon).
3.
Starting with Cables A and C
, attach the Button ends of Cables A and C to the Tie Plate.
As shown in the drawing on the previous page, A goes on the bottom, C above it.
4.
Route Cables A and C towards where the double sheaves are going to be re-installed.
Put both cables into position such that when the double sheaves are re-installed, Cables A and C
will both be going around the Sheaves.
5.
Reinstall the double sheave for Cables A and C.
Refer to
for a drawing of how to reinstall the double sheave.
6.
Switching to just Cable A
, remove the Retainer Bolt under the Crosstube Sheave.
Summary of Contents for D4-9
Page 10: ...D4 9 D4 9X Four Post Lifts 10 P N 5900251 Rev A1 August 2021 Specifications Side View Top View...
Page 60: ...D4 9 D4 9X Four Post Lifts 60 P N 5900251 Rev A1 August 2021...
Page 71: ...D4 9 D4 9X Four Post Lifts 71 P N 5900251 Rev A1 August 2021 Labels...
Page 72: ...D4 9 D4 9X Four Post Lifts 72 P N 5900251 Rev A1 August 2021...
Page 73: ...D4 9 D4 9X Four Post Lifts 73 P N 5900251 Rev A1 August 2021...
Page 74: ...D4 9 D4 9X Four Post Lifts 74 P N 5900251 Rev A1 August 2021...
Page 75: ...D4 9 D4 9X Four Post Lifts 75 P N 5900251 Rev A1 August 2021 Parts Drawings...
Page 76: ...D4 9 D4 9X Four Post Lifts 76 P N 5900251 Rev A1 August 2021...
Page 77: ...D4 9 D4 9X Four Post Lifts 77 P N 5900251 Rev A1 August 2021...
Page 78: ...D4 9 D4 9X Four Post Lifts 78 P N 5900251 Rev A1 August 2021...
Page 79: ...D4 9 D4 9X Four Post Lifts 79 P N 5900251 Rev A1 August 2021...
Page 80: ...D4 9 D4 9X Four Post Lifts 80 P N 5900251 Rev A1 August 2021...
Page 81: ...D4 9 D4 9X Four Post Lifts 81 P N 5900251 Rev A1 August 2021 Maintenance Log...
Page 82: ...D4 9 D4 9X Four Post Lifts 82 P N 5900251 Rev A1 August 2021 Maintenance Log...
Page 83: ...D4 9 D4 9X Four Post Lifts 83 P N 5900251 Rev A1 August 2021 Maintenance Log...
Page 85: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2021 BendPak Inc All rights reserved dannmar com...