Installation procedure

1.  Please read these notes carefully before commencing work. In case of doubt 

please consult a qualified electrician. Ensure wires and cables are securely held 

within the connection terminals.

  IMPORTANT: The CZ CEFL DALI Control Unit clock battery must be engaged 

(ON) prior to installation by switching the RED dip switch (see diagram D) to 

the DOWN position.

2.  POSITIONING: The CZ CEFL DALI switch should be installed to achieve correct 

coverage of the area, see diagram B. If the photocell override facility (enabled via 

ControlZAPP app) is required, the switch must be located above an area where 

daylight can give greater illumination than the artificial light. Avoid locating this 

product where it is exposed to drafty conditions (exposed lobbies, open ceiling 

voids or near fans) or near heat sources. To cover large areas PIRs should be 

spaced in a 5 metre grid formation.

3.  Disconnect the ControlZAPP device from the circuit before performing insulation 

testing of the wiring circuit. 

4.  Do not connect on a circuit with large inductive loads, as induced spikes may 

cause false triggering or damage the device.

5.  CZ CEFL DALI must be connected to its ControlZAPP Power Supply via the 

ControlZAPP communication cable provided, for wiring see diagram C.  

NOTE: The use of non ControlZAPP connectors may damage the CZ CEFL DALI 

device and will invalidate the warranty.

Settings and calibration

NOTE: ALL settings are adjusted by ControlZAPP App as specified in the 

ControlZAPP App User Guide

 (downloadable from the DANLERS website) 

including: MODE settings, SCHEDULER settings and photocell settings and 

intelligent photocell calibration procedure. 
MODE settings include: Detect Movement (enable or disable), Sensitivity, Short 

Visit Mode (with timer), Turn ON automatically (Presence detection or Absence 

detection), Turn OFF timeout (from10sec to 23hrs 59min 59sec),  Respond to 

Daylight (enabled or disabled) the calibration process must be run for the intelligent 

photocell to work. Delay before ON or Delay before OFF timers, Scene Recall (ON 

or OFF).
SCHEDULER settings include: 
DAY TYPES (defining times for each of the different Modes to occur).
WEEKLY SCHEDULE (defining which Day Types are assigned to different days of 

the week).
EXCEPTIONS (defining exceptions to the schedule such as holidays).
VIEW ON CALENDAR (overview of schedule).

L

N

DALI Power

Supply Unit*

DALI

Ballast

ControlZAPP device

CZ CEFL DALI

DALI Control Lines

DALI

Ballast

*DANLERS Order code: DBPSU

Optional 

other load

100 - 260VAC  50/60Hz

SL

L

N

A: Mounting diagram

 

B: Detection diagram

up to 5m
up to 7m

Strong detection zone 

i.e. person moving arm

or walking towards PIR

Secondary detection 

zone i.e. person 

walking perpendicular 

to PIR 

For optimum coverage 

recommended 

mounting height: 2.4 to 5m

C: Wiring diagram

SL  

L
L  

N

Telejack connector

Control Unit

Power Supply

Red dip switch (MUST be 

switched DOWN (towards lens) 

to engage clock battery ON)

IMPORTANT

DA  

DA

D: Connector diagram

CEILING VOID 

(At least 78mm deep) 

75mm circular hole 

cut for PIR switch

Reviews: