Procedure
1. Remove the LCP, the terminal cover, and the LCP frame from the drive.
2. Fit the option into slot B.
3. Connect the control cables and relieve the cable. See
for wiring details.
4. Remove the knockouts in the extended LCP frame (supplied).
5. Fix the extended LCP frame and terminal cover on the drive.
6. Fit the LCP or blind cover in the extended LCP frame.
7. Connect power to the drive.
8. Set up the input/output functions in the corresponding parameters.
e3
0b
e1
83
.1
1
1
2
5
4
3
1 LCP
3 Slot B
5 LCP frame
2 Terminal cover
4 Option
Illustration 1: Installation in Enclosure Sizes A2, A3, and B3
3.3 Mounting the Option in Enclosure Sizes A5, B1, B2, B4, C, D, E, and F
Context:
The installation procedure depends on the enclosure size of the drive. This procedure is for installation in enclosure sizes A5, B1, B2, B4,
C, D, E, and F.
Installation
Installation Guide | VLT® Programmable I/O MCB 115
AN295938195323en-000101 / 130R0655| 9
Danfoss A/S © 2020.01
Summary of Contents for VLT MCB 115
Page 2: ......