Figure 20-8 Interlock Circuit Tests
Measure the voltage between each customer interlock terminal and the frame ground while the interlock contacts
are open and closed. In either contact state, if the measured voltage is not zero (0), verify the source of the voltage.
Do not connect the interlock terminals until the voltage source is removed (refer to Figure 20-9 Typical Electrical
20.7 Power Wiring
This section describes the connection of the power wiring to the compressor.
NOTE
l
The AC input cable should be CSA, UL, or CE approved, 3-wire with a common shield and single ground. It is recommended
that the cable be double-jacketed; for example, a teck cable type. The cable must be rated for 90° C (194° F) minimum with a
maximum current rating corresponding to the LRA value on the compressor nameplate.
l
Keep power cables and control interface cables in separate conduits. Use metal cable glands for shielded cables to ensure
good grounding.
l
If you are installing a line reactor or EMI or harmonic filter in the mains input circuit, refer to Figure 20-9 Typical Electrical
Connections for the proper placement within the input power wiring.
Figure 20-9 Typical Electrical Connectionsshows a typical schematic for the compressor’s electrical connections.
M-AP-001-EN Rev. S-9/8/2021 Page 121 of 136
Summary of Contents for Turbocor TTS Series
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK Page 2 of 136 M AP 001 EN Rev S 9 8 2021...
Page 8: ...Page 8 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 10: ...Page 10 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 20: ...Figure 2 2 Compressor Nomenclature Page 20 of 136 M AP 001 EN Rev S 9 8 2021...
Page 24: ...Page 24 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...Page 40 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 44: ...Page 44 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 52: ...Page 52 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 54: ...Page 54 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 66: ...Page 66 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 68: ...Page 68 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 70: ...Page 70 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 72: ...Page 72 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 74: ...Page 74 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 80: ...Page 80 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 94: ...Page 94 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 110: ...Page 110 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 112: ...Page 112 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 114: ...Page 114 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 126: ...Page 126 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 128: ...Figure B 2 Grounding Diagram Page 128 of 136 M AP 001 EN Rev S 9 8 2021...
Page 132: ...Page 132 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 134: ...Page 134 of 136 M AP 001 EN Rev S 9 8 2021 THIS PAGE INTENTIONALLY LEFT BLANK...