15
Your programmable thermostat
The TP9 is a programmable thermostat designed to control both your
hot water and heating. You can programme up to 6 different time and
temperature settings per day for the heating, and the hot water can
be turned on and off twice a day.
The TP9 will control your heating and hot water together or
independently (i.e. hot water only during the summer, heating
only for frost protection when building is empty). It also features 2
temporary user overrides for added convenience.
How to read the display
User Instructions
Indicates the day
of the week
Indicates unit has been
disconnected from the
mains, i.e. after a powercut
Indicates the WATER +1HR
override is in operation
When Central Heating is ON, a
fl ame symbol appears in the
display and the red CH indicator
illuminates.
When Hot Water is ON, a tap
symbol appears in the display and
the HW indicator illuminates.
Indicates that the room temperature
has been raised manually
(
indicates temperature lowered).
Programmed
room
temperature
Indicates the clock time (when
in RUN mode) or the ON or OFF
time when checking/adjusting
the programme
Indicates whether
time is AM or PM
General display
Display when programming hot water
Indicates Hot Water
programme setting
Indicates the clock time (when in RUN
mode) or the ON or OFF time when
checking/adjusting the programme
Indicates whether
time is AM or PM
Indicates whether time
is an ON or OFF setting
U
ser Instruc
tions
GB
Summary of Contents for TP9
Page 52: ...52 1 5 m 1 mm2 54 60 24 5 2 5 2 PUMPED 24 2 3 24 HR GRAVITY 1 GRAVITY GR...
Page 53: ...53 5 30 C 16 30 C TP9 4 GR...
Page 54: ...54 TP9 50 Volt 1 mm2 50 GR...
Page 55: ...55 9 1 GRAVITY N L 1 2 3 4 5 6 HW OFF HW ON CH OFF CH ON 3 GR...
Page 61: ...61 TP9 6 TP9 WATER 1HR ON CH HW RUN ON OFF AM PM RUN ON OFF AM PM GR...
Page 63: ...63 3 12 00 1 PROG 10 M RESET GR...
Page 64: ...64 PROG MO TU 62 PROG RUN 5 2 GR...
Page 65: ...65 ON OFF PROG 63 24 5 2 PROG 1 Event 1 24 66 5 2 67 68 GR...
Page 66: ...66 1 PROG 1 Event 1 1 2 2 PROG a PROG b c 3 PROG RUN 4 69 24 GR...
Page 67: ...67 1 PROG 1 MOTUWETHFR 2 1 3 4 2 PROG 5 3 4 5 6 2 4 5 2 GR...
Page 68: ...68 6 PROG 1 SASU 7 1 8 9 2 PROG 10 3 4 5 6 7 9 11 PROG RUN 12 69 GR...
Page 69: ...69 PROG A On a b PROG B Off C On D Off PROG RUN GR...
Page 70: ...70 TP9 3 1 2 CH HW GRAVITY 3 ON 16 C CH GR...
Page 71: ...71 TP9 1HR 1 HR ON O GR...
Page 72: ...72 15 16 15 12 00 MO 5 2 63 64 GR...
Page 96: ...96 www danfoss com BusinessAreas Heating Part No 6578 Issue 02 05 06...