33 of 114
M-AP-001-EN Rev. Q
4.3 Compressor I/O Board Mounting Details
The Compressor I/O Board (Figure 4-4) must be installed in a Underwriters Laboratories (UL) approved
electrical enclosure equipped with DIN EN 50022, 50035, or 50045 mounting rails. The board should
be mounted in a dry area, free from vibration and electrical noise.
Figure 4-4 Compressor I/O Board
4.3.1 Compressor I/O Board Mounting Instructions
1. Tilt the I/O Board as shown in "Figure 4-5 Compressor I/O Board Installation" in order to engage
it into the DIN Rail.
2. Lower the I/O Board until it snaps into place.
Figure 4-5 Compressor I/O Board Installation
NOTE
The UL listed enclosure should protect against moisture and other corrosive elements.
Summary of Contents for TGH Series
Page 8: ...8 of 114 M AP 001 EN Rev Q THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 10: ...10 of 114 M AP 001 EN Rev Q THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 34: ...34 of 114 M AP 001 EN Rev Q THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 38: ...38 of 114 M AP 001 EN Rev Q THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 46: ...46 of 114 M AP 001 EN Rev Q THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 54: ...54 of 114 M AP 001 EN Rev Q THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 56: ...56 of 114 M AP 001 EN Rev Q THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 58: ...58 of 114 M AP 001 EN Rev Q THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 78: ...78 of 114 M AP 001 EN Rev Q THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 88: ...88 of 114 M AP 001 EN Rev Q Figure 16 17 Suction Port All Models ...
Page 94: ...94 of 114 M AP 001 EN Rev Q THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 96: ...96 of 114 M AP 001 EN Rev Q THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 98: ...98 of 114 M AP 001 EN Rev Q THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 108: ...108of114 M AP 001 EN Rev Q THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 110: ...110of114 M AP 001 EN Rev Q THIS PAGE INTENTIONALLY LEFT BLANK ...