VU.IG.B9.02
© Danfoss | Energy Meters | 2019.03 | 13
Installation guide
SonoSelect and SonoSafe
2.10 Mains supply
1. Before handling module PCB ensure relevant
ESD regulations are observed (IEC 61340-5-1).
1.1 Do not connect the cable to 230V before
installing it in energy meter
2. Break installation seal on both sides and open
enclosure.
3. Screw on the cable gland.
4. Remove protective cap from screw terminals.
5. Insert cable through cable gland hole to secure
IP class and strain relief. In case stranded wire is
used Ferrules are required.
6. Connect cable and fix it to screw terminals.
Tighten the cable gland.
230V