SET3M
6
GB
NOTE
: For mains voltage applications links must be fi tted between
terminals L, 2 and 5.
3.1 Wiring
N/O
ON
NOTES:
FOR SET2E LINK
TERMINALS 1 & 5
FP975 ON A SET
WALLPLATE
N L 1 2 3 4 5 6
TIMER
OFF
COM
DHW
ON
N/C
COM
HTG
OFF
N/O
N/C
Typical wiring diagrams for various types of systems are shown on
the following pages.
Note: Whilst every attempt has been made to ensure the accuracy of this
information it is recommended that the specifi c information relating to
the ancillary controls is obtained from the manufacturers concerned.
10. Then press both
WATER
and
HEATING
rocker switches to the
OFF
position and check that both services do not operate.
11. Finally, press both
WATER
and
HEATING
rocker switches to
TIMED
position prior to programming the unit.