14 | AX450533577373en-000201
© Danfoss | Climate Solutions | 2023.07
4.5 Assembling
¾
Fit the terminal box with the seal.
DANGER
Carry out the additional work steps such as „filling the oil“ etc. as per the assembly instruction.
See the assembly instruction, in particular the „Start-up“ chapter.
HG7/HGZ7
HG8/HG88e
Assembly
34 Nm
15 Nm