It  is  recommended  to  cover  the  cables  with  a  layer  of  sand  or  concrete  at  least  1"  (2.5  cm) 
before  the  asphalt  is  applied  to  protect  them  from  the  heat  of  the  asphalt.    Use  of  sand  or 
concrete  will  ensure  an  effective  and  efficient  heat  transfer  through  the  asphalt.

      If  using  sand  or  concrete,  allow    the  asphalt  to  cool  to  a  temperature  of  265°F  (130°C) 

maximum  before  pouring.  If  using  without  sand  or  concrete,  allow  asphalt  to  cool  to 
220°F/  (105°C)  before  pouring  directly  on  mats/cables.  Ground  sensors/tubes  should  not 
be  exposed  to  temperatures  above  80°C  (176°F.)

The  cables  are  normally  covered  by  2  inches  of  asphalt. 

A  perimeter  of  maximum  12”  (30  cm)  of  asphalt  should  exist,  unheated  around  the 
embedded  cables.    This  allows  for  adjustment  of  the  paving  surface  edge  without 
damaging  the  heating  cable.

        The  operating  weight  of  the  asphalt  roller  should  not  exceed  1000lbs.

Asphalt  Installation  (continued)

When  installing  heating  cables  the  following  should  be  observed:

Begin  installation  as  close  as  possible  to  electrical  supply  source.  The  heating  cable 

must      not  be  cut  or  shortened  or  exposed  to  strain  in  the  areas  of  the  cold  tail/heating 
cable  coupling.

When  placing  the  sensors  please  see  page  7.

Special  care  should  be  taken  not  to  damage  the  heating  cables  with  tools  and 

machinery  during  the  installation  and  application  of  the  surface  material.

Ensure  that  all  sharp  stones  and  debris  are  removed  from  the  area  where  the  heating 

cables  are  going  to  be  installed.

Should  the  cable  become  damaged  during  the  installation  process  it  is  helpful  to  know 

the  location  of  the  cold  tail/heating  cable  connection.    Take  a  picture  or  sketch  to  show 
where    the  connection/end  cap  is  in  case  a  fault  needs  to  be  found.

Insulation  can  be  installed  to  improve  efficiency  of  the  heating  system.

Stonework    Installation

12

               

ASPHALT

ASPHALT

GX  HEATING  MAT/CABLE

SAND/CONCRETE
EMBEDDING

CRUSHED  STONE
AND/OR  INSULATION

CRUSHED  STONE
AND/OR  INSULATION

GROUND

GROUND

GX  HEATING  MAT/CABLE  IN  ASPHALT
(ALLOW  ASPHALT  TO  COOL  TO  220  F
BEFORE  POURING  ON  MATS/CABLES)

MAT  EMBEDDED  IN 
SAND/CONCRETE

MAT  EMBEDDED
DIRECTLY  IN  ASPHALT

Copyright 

 

20

17

 

 

Danfoss 

 

 

TEL: 

 1-888-326-3677

 

FAX: 

 416-352-5981

VIAPF222  05/17

Copyright 

 

20

17

 

 

Danfoss 

 

 

TEL: 

 1-888-326-3677

 

FAX: 

 416-352-5981

VIAPF222  05/17

Summary of Contents for GX Series

Page 1: ...Installation Manual Danfoss GX Heating Cables Mats Manuel d installation C bles et tapis de chauffage Danfoss GX DanfossG GXTM BRINGING WARMTH TO LIFE...

Page 2: ...Danfoss GX C ble tapis Danfoss GX Mises en garde Lignes directrices g n rales d installation Installation du d tecteur Placement du d tecteur Installation du tapis c ble de chauffage Installation dan...

Page 3: ...this time It is recommended to install thermal insulation below the application of the heating cables or mats Improved performance and efficiency will decrease overall operating costs CAUTION It is i...

Page 4: ...Idealfordriveways parkinglots sidewalks stairs ramps loadingareasandbridges Reduces the environmental impact of snow and ice removal by eliminating the use of fossil fueldrivensnowblowers snowplows ro...

Page 5: ...ng cables touch cross or overlap Remember to always measure verify and record the actual resistance throughout the installation process 1 Out of the box 2 After installation 3 Before pouring the sand...

Page 6: ...commodate drains obstructions or bends in the layout By carefully cutting the mat tape many patterns and designs can be created The figure below illustrates this Free Cable and Cable Strapping Should...

Page 7: ...t 4 A metal plastic pipe through which the sensor cable may be passed should be run as far as the sensor conduit 5 Coil approx 1 5 0 5m of the sensor cable inside the conduit 6 Place the sensor inside...

Page 8: ...in terms of detection and activation than a two sensor ground system where one sensor measures the ground temperature and the other sensor measures the moisture 4 With more than two sensors it is pos...

Page 9: ...mmended to use Danfoss cable strapping Attach the cable strapping to the rebar or other supporting structure using tie wraps The strapping should be laid perpendicular to the direction the cable will...

Page 10: ...se a fault needs to be found Connection of the heating cable must be carried out by an authorized electrician Note the maximum output allowed for your installation Do not exceed it Contact your local...

Page 11: ...when it is poured The concrete mixture must not contain sharp stones as these may damage the cable The concrete should be allowed to set for 30 days before the heating cables are turned on It is not r...

Page 12: ...connection end cap is in case a fault needs to be found Connection of the heating cable must be carried out by an authorized electrician Note the maximum output allowed for your installation Do not ex...

Page 13: ...e as possible to electrical supply source The heating cable must not be cut or shortened or exposed to strain in the areas of the cold tail heating cable coupling When placing the sensors please see p...

Page 14: ...An upstream disconnect must be installed to ensure a means of de energizing the cable or mat At low temperatures the heating cable stiffens and may be difficult to work with To overcome this connect...

Page 15: ...shall be made within the extended warranty period Danfossshallnotbeliableforanyclaimsmadelaterthantenyearsfromdateofpurchase Danfoss shall not be liable for any consequential and secondary costs or d...

Page 16: ...and d installer l isolation thermique sous les c bles ou tapis de chauffage Le rendement et l efficacit accrus permettront une r duction des co ts de fonctionnement MISE EN GARDE Il est important de f...

Page 17: ...al pour les entr es les terrains de stationnement les trottoirs les escaliers les rampes les aires de chargement et les ponts R duit l impact sur l environnement de l enl vement de la neige et de la...

Page 18: ...ut tre allong au besoin N installez pas les c bles Danfoss GX de fa on que deux c bles de chauffage noirs se touchent se croisent ou se chevauchent N oubliez pas de toujours mesurer v rifier et consig...

Page 19: ...fixez le c ble GX avec une courroie Danfoss suivez les instructions ci dessous qui facilitent l installation 1 Fixez la courroie de fixation Danfoss au sol 3 pi de distance 2 Placez le c ble GX espac...

Page 20: ...emple Ce tube est con u pour tre mont sur une plaque gr ce aux deux trous vis l int rieur du conduit 4 Un tuyau en m tal ou en plastique par lequel passe le c ble du d tecteur doit aller aussi loin qu...

Page 21: ...b assurer la fonte compl te de toute la neige ou glace Un dispositif un seul d tecteur est plus lent qu un dispositif deux d tecteurs en ce qui a trait la d tection et l activation car un des deux d...

Page 22: ...la barre d armature ou une autre structure de soutien au moyen d attaches Les courroies doivent tre dispos es la perpendiculaire par rapport au sens de d roulement du c ble Espacez les 75 cm 3 pi les...

Page 23: ...nez une photo ou faites un dessin pour savoir o s effectue le raccord et o se trouve l embout en cas de d fectuosit Le raccord du c ble de chauffage doit tre effectu par un lectricien autoris Prenez n...

Page 24: ...45 cm 3 pi car le b ton peut d placer le c ble lors de son versement Le m lange de b ton ne doit pas contenir de pierres tranchantes car cela pourrait endommager le c ble Le b ton doit s cher pendant...

Page 25: ...e de conna tre l emplacement du raccord entre le c ble de chauffage et le bout froid Prenez une photo ou faites un dessin pour savoir o s effectue le raccord et o se trouve l embout en cas de d fectuo...

Page 26: ...sur les c t s de la surface chauff e pour am liorer l efficacit du syst me de chauffage Voyez la page 7 pour le placement des d tecteurs Il faut faire particuli rement attention de ne pas endommager...

Page 27: ...votre installation Ne la d passez pas Si vous avez des questions ou des inqui tudes communiquez avec votre d positaire Danfoss GX local Assurez vous que le c ble n est pas soumis une tension ou une pr...

Page 28: ...E EXPLICITE OU IMPLICITE QUANT LA QUALIT MARCHANDE OU L ADAPTATION DU PR SENT DISPOSITIF UN USAGE PARTICULIER DANFOSS N ASSUME AUCUNE RESPONSABILIT NI N AUTORISE AUCUNE PERSONNE ENTREPRISE OU SOCI T A...

Reviews: