COMMISSIONING CERTIFICATE
The station is the direct link between the district heating supply and the house installation.
Before commissioning the home station, the rest of the system must be thoroughly rinsed and the tightness of the connections checked.
Once the system has been filled with water, all pipe connections must be retightened before pressure testing for leaks. Clean the dirt traps
and adjust according to the instructions in this manual.
When installing, comply with all local standards and regulations.
Installation and commissioning must only be carried out by qualified and authorized persons.
The station has been tested in the factory for leaks before delivery, but after transport, handling and heating of the system, all screw con-
nections and connections must be checked and, if necessary, tightened. Please note that the connections can be made with EPDM rubber
gaskets. Therefore, it is very important not to over-tighten the union nut, as this can lead to leaks. The manufacturer assumes no liability
for leaks resulting from overvoltage.
To be completed by the installer
This plant has been redrawn, adapted and put into operation
date:
by installer: