30
Installation
Guide
DLX series L00410622-01
If the inverter is set to master, data must be collected from the follower inverters. The
following screen is displayed:
7. Grid Configuration
Enter
– Call up the list of grid configurations
Up or Down
– Select the grid configuration of
the actual installation site:
TN/TT
,
IT
,
Undefined
Enter
– Confirm
Left
– Back
Right
– Next
Enter
– Confirm
8. Feeding Phase
Enter
– Call up the list of phases
Up
or
Down
–
Select the preferred phase:
- TN/TT
:
Not set
,
L1
,
L2
,
L3
- IT
:
Not set
,
L1-L2
,
L1-L3
,
L2-L3
Enter
–
Confirm
Left
– Back
Right
– Next
Enter
– Confirm
If the inverter is set to master, and there is more than one inverter in the plant, the
following screen is displayed: