background image

Appendix UK – 3

Important information/Safety regulations

DD

D D

These instructions are a UK-specific appendix to those instructions found in the Installation instructions .

DD

D D

Read the Installation instructions prior to installation .

DD

D D

For 

DHP Opti Pro SP

 (Single Phase) heat pumps it is imperative that the maximum hot water temperature 

is altered from the default factory setting from 95°C to 60°C . Refer to Chapter 9 .8 menu Service – HGW 
Parameter MAX TEMP in Installation instructions .

DD

D D

Hard Water Areas; Normally it is not a problem to install a heat pump in hard water areas since the normal 
domestic hot water working temperature will be not greater than 60°C . In areas where exceptional water 
conditions prevail, consideration may need to be given to the fitting of a device capable of inhibiting scale . 
In such circumstances the advice of the local water authority should be sought .

DD

D D

The immersion heater, thermostat, and thermal cut-out are supplied by Danfoss and are factory fitted . If a 

replacement part is necessary, it must be replaced with a Danfoss spare part . 

DD

D D

The water heater is protected with a sacrificial aluminium anode . Under normal circumstances no mainte-

nance is needed .

DD

E D

Note! Leave the following documents with the end-user;

This manual 

Installation instructions 

User manual

The above documents are an integral and essential part of the product . They should be kept with the appli-

ance so that they can be consulted by the user and our authorised personnel . 
Please read carefully the instructions and notices about the appliance contained in this manual, as they pro-

vide important information regarding the safe installation, use and maintenance of the heat pump .

1.1 

Test results

1.1.1 

Heat up time

The heat up time is measured when heating the water from 14°C to 60°C .
DWH 300: Heat up time 1 hour 53 minutes
DHP-H, DHP-A, DHP-AQ Maxi and DWH 200: Heat up time 1 hour 3 minutes

1.1.2 

Re-heat time

The re-heat time is measured when 70% of the hot water has been drained and replaced by equal amount 

14°C water and re-heated to 60°C .
DWH 300: Re-heat times 70% 1 hour 25 minutes
DHP-H, DHP-A and DWH 200: Re-heat time 70%  41 minutes
DHP-AQ Maxi: 1 hour 6 minutes according to EN12897 .

1.1.3 

Pressure drop

The measured pressure drop throgh the primary heater is 15 kPa .

1.1.4 

Hot water capacity

DHP-AQ Maxi: 160 liter according to EN12897 .

Summary of Contents for DHP-A

Page 1: ...VIBMB402 086U8255 Rev 4 UK specific appendix to Installation instructions DHP A DHP A Opti DHP AQ Maxi DHP H DHP H Opti DHP H Opti Pro DHP L DHP L Opti DHP L Opti Pro...

Page 2: ...gulations 3 1 1 Test results 3 2 About documents and labels 4 2 1 Manufacturer labels 4 3 Piping installation 8 3 1 General 8 3 2 System solution 9 3 3 Discharge pipe arrangement 13 4 Commissioning 14...

Page 3: ...The water heater is protected with a sacrificial aluminium anode Under normal circumstances no mainte nance is needed E E Note Leave the following documents with the end user This manual Installation...

Page 4: ...efrigerant Kg 1 2 Connection Electric connection V 400 3N 50Hz Power input Total kW 5 0 8 0 11 0 Power input Heat pump kW 2 0 Power input Auxiliary Heater kW 3 6 9 Pressure Vessel Volume Sec Prim l 18...

Page 5: ...er input Total kW 3 1 6 1 9 1 Power input Heat pump kW Power input Auxiliary Heater kW 3 6 9 Pressure Vessel Volume Sec Prim l 180 7 5 Design Pressure Sec Prim MPa 1 0 0 3 Test Pressure Sec Prim MPa 1...

Page 6: ...r 90 95 C Maximum primary working pressure 1 5 bar Immersion heater D76 9 kW 230 V WARNING TO THE USER a Do not remove or adjust any component part of this unvented water heater Contact the installer...

Page 7: ...valve 6 bar Expansion vessel charge pressure 3 bar Operating pressure 5 5 bar Temp and pressure release valve 10 bar 90 95 C Maximum primary working pressure 1 5 bar Immersion heater D76 9 kW 230 V W...

Page 8: ...19 liter FITT0052 1 Expansion vessel bracket 132 FITT0053 1 Flexible hose FITT0001 1 Tundish 15x22 mm 129 FITT0054 1 Unvented manifold assembly 3 1 2 Unvented manifold assembly E A B C D Figure 1 Unv...

Page 9: ...ainer 96 Flexible hose 110 Expansion vessel 113 Expansion heating system 126 Factory fitted combined Temperature and pressure relief valve 128 Double check valve with Shut off valve 129 Unvented manif...

Page 10: ...r 96 Flexible hose 104 Safety relief valve 2 5 bar 110 Expansion vessel 113 Expansion heating system 126 Factory fitted combined Temperature and pressure relief valve 128 Double check valve with Shut...

Page 11: ...1 Strainer 96 Flexible hose 104 Safety relief valve 2 5 bar 110 Expansion vessel 113 Expansion heating system 126 Factory fitted combined Temperature and pressure relief valve 128 Double check valve w...

Page 12: ...100 Safety relief valve 110 Expansion vessel 113 Expansion heating system 126 Factory fitted combined Temperature and pressure relief valve 128 Double check valve with Shut off valve 129 Unvented man...

Page 13: ...pipe from tundish with continuous fall 1 in 200 5 Discharge below fixed grating 6 Trapped gully Sizing of copper discharge pipe 4 for common temperature relief valve outlet sizes Valve outlet size Mi...

Page 14: ...er supply 2 Open both cold and hot water taps which are situated as low as possible in the building to depressu rise the system E E Please note that there can be some water remaining in the cold water...

Page 15: ...Appendix UK 15...

Reviews: