Con
tr
ol & o
ver
vie
w
s
ECL Card settings
30
A
Time and date
Section 17
B
System information
Sections 18 & 19
C
Setting ranges
Factory settings
Your settings
1
Cut-out temperature difference
1 ... 99 K
15 K
See section 27
2
Cut-in temperature difference
1 ... 99 K
20 K
See section 27
3
4
Proportional band, Xp
1 ... 250 K
80 / 180 K
See section 26
5
Integration time, Tn
5 ... 999 sec.
30 sec.
See section 26
6
Running time of the motorized control
valve
5 ... 250 sec.
35 sec.
See section 26
7
Neutral zone, Nz
0 ... 9 K
3 K
See section 26
Summary of Contents for C17
Page 9: ...Installation 11b...
Page 10: ...Installation Electrical connections 230 V a c in general 12a 230 V a c connections Optional...
Page 12: ...Installation Electrical connections 24 V a c in general 13a 24 V a c connections...
Page 17: ...Installation 14c...
Page 25: ...The grey side of the ECL Card Basic set up 20b...