2.
1.
Fasten 1 M5x12 screw (T25) in the center of the ground bar, attaching it to the lower EMC shield.
T25
e3
0b
k1
99
.1
0
T25
T25
Illustration 3: Installation of Single Ground Bar (FK09a/FB09a, FK10a/FB10a, FK10c/FB10c)
2.4 Installing the Split Ground Bar
For kits with a 2-part split ground bar, use the following steps to attach the left and right sections of the ground bar.
Attach the left ground bar between the left side bracket and the EMC shield using 2 M5x18 screws (T25), 1 in each end of
the ground bar.
The right ground bar attaches to the EMC shield just below the position of the left ground bar. See
.
AN422434236428en-000201 / 136R0288 | 5
Danfoss A/S © 2022.10
Installation
Ground Bar Kit for FK09/FB09 and FK10/FB10
Installation Guide