background image

2.

1.

Fasten 1 M5x12 screw (T25) in the center of the ground bar, attaching it to the lower EMC shield.

T25

e3

0b

k1

99

.1

0

T25

T25

Illustration 3: Installation of Single Ground Bar (FK09a/FB09a, FK10a/FB10a, FK10c/FB10c)

2.4 Installing the Split Ground Bar

For kits with a 2-part split ground bar, use the following steps to attach the left and right sections of the ground bar.

Attach the left ground bar between the left side bracket and the EMC shield using 2 M5x18 screws (T25), 1 in each end of
the ground bar.

The right ground bar attaches to the EMC shield just below the position of the left ground bar. See 

Illustration 4

.

AN422434236428en-000201 / 136R0288 | 5

Danfoss A/S © 2022.10

Installation

Ground Bar Kit for FK09/FB09 and FK10/FB10

Installation Guide

Reviews: