background image

25

24

Manual 

Manual 

STAGE 6

STAGE 7

STAGE 8

Extension of the frame 
length.

Connecting of the second end section to the frame. 

2

fig. 6.1

4

2

Assembled  power  arc  is 
brought to the assembled 
end section at the distance 
of  the  main  runner  and 
joined  to  it  with  the  use 
of main runners

 2

 and

 2н 

align  the  side  flanges  of 
shapes 

(fig. 6).

It  is  recommended  to 

Assembly  of  the  second 
end section is carried out 
similar to the assembly of 
the first end section.If the 

Assembled  second    end 
section  is  brought  to  the 
frame  at  the  distance  of 
the  main  runners  and  is 
connected  to  the  frame 
with the help of them.

INSTALLATION SEQUENCE 

The second end section 
assembly. 

connect  the  outermost 
and  middle  runners  first, 
using a stepladder.
Next  power  arc  is  joined 
to the power arc that has 
already  been  connected, 
and so on all the arcs are 
alternatively joined

It  is  recommended  to 
connect  the  outermost 
and  middle  runners  first, 
using  a  stepladder.  Lines 
of runners are leveled and 
foundation  stay  braces 

are covered 24
with  earth.  The  earth 
is  compacted.  If  it  is 
necessary,  aligning  is 
repeated.

greenhouse is assembled 
without  inserts

  (L-4,2м), 

runners  and  longitudinal 
stiffness  side  braces  are 

installed 
when the end wall is in vertical 
position similar   to

 Fig.6.1

DOORS AND GATES ASSEMBLY

А
Б

В

Г

Е

Д

З

Ж

13-д

14-д

13-д

14-д

12-д-п    

П-12-д-п

13-д    

П-13-д

12-д-л

А

B

C

D

F

H

E

G

13-в

14-в

13-в

14-в

12-в-л

13-в    

П-13-в

12-д-п    

П-12-д-п

А

C

F

H

Fig. 9.1

13

14

14

14

12

13

13

П-13

12

12

13

12

E

G

П-12

12

screw

screw

B

screw
screw

D

12

16-к

Doors and gates assembly.
Doors and gates assembly is carried out in 
the same way. Units are shown in figures.

STAGE 9

Summary of Contents for TITAN Arch 196

Page 1: ...17 02 2020 for Greenhouse TITAN Arch 196 Manual...

Page 2: ...any length 1 2 f o e l p i t l u m min 4 2 m width 7 46 m height 3 8 m...

Page 3: ...AGE TITAN Arch 196 2800 200 100 41 0 7 PACKAGE TITAN Arch 196 2800 200 100 34 0 8 PACKAGE TITAN Arch 196 500 300 100 14 0 9 PACKAGE TITAN Arch 196 2700 100 90 37 0 10 PACKAGE TITAN Arch 196 500 300 10...

Page 4: ...TITAN Arch 196 5 Bottom arc strainer 2 2 73 5 Top arc strainer 2 2 73 6 Segment strainer 3 2 58 7 Radial strainer 1 4 0 3 7 Radial strainer 2 3 0 54 3 Support 2 0 29 1 Foundation stay brace 2 0 84 3 P...

Page 5: ...78 Bolt 6 14 123 Bolt 6 20 50 Nut 6 251 Bracket 26 17 16 97 Hanger 3 Hinge 1 130 left 2 Straight lug 40 90 2 Pull 80 2 2 Self driving screw 97 Washer 6 91 Table 6 DETAILED PARTS LIST INSERT marking na...

Page 6: ...e as an unheated housing awning warehouse etc it is necessary to control the snowcap to shift the snow down with a wooden or plastic scraper installed on a pole For these variants of operation it is p...

Page 7: ...EXTENDING INSERTS 2 1 1 3 D 2 4 4 5 8 B D E C F Fig 1 General view of the greenhouse with two inserts total length is 8 4 m insert C 2 2 4 5 B 4 5 5 9 5 5 11 4 2 4 4 3 Vocabulary Left side on the lef...

Page 8: ...WITH EXTENDING INSERTS ONE INSERT extends the greenhouse by 2 13 m Number of the inserts for the greenhouse is not limited Fig 1 Fig 1 General view with the anteroom ceiling window door wall side piec...

Page 9: ...arts is carried out in a horizontal plane by connection on side walls of a shape Arcs are connected to each other by nesting at length of the cut with alignment of holes view A bolt 6 14 bolt 6 14 bol...

Page 10: ...t 6 14 bolt 6 14 bolt 6 14 washer 6 washer 6 washer 6 washer 6 Foundation stay braces 1 supports 3 are connected 1 align the side flanges of shapes fig 1 7 view C R 9 10 9 9 9 1 10 10 10 10 10 10 10 1...

Page 11: ...ly joined end runners 2 2 align the side flanges of shapes Runners deviate from the vertical under their own weight and abut against side walls of shapes of arcs 4 until the next operation Installatio...

Page 12: ...washer 6 G 7 6 5 INSTALLATION SEQUENCE General view of the power arc General view of the power arc with the anteroom fig 3 5 fig 3 4 If thegreenhouseisequippedwiththeanteroom install details of the an...

Page 13: ...st and middle runners first STAGE 4 fig 4 1 fig 4 2 2 2 fig 4 2 2 4 STAGE 5 End section installation Inthevariantofinstallation of the greenhouse without a foundation marking of axes is made on the gr...

Page 14: ...and middle runners first using a stepladder Next power arc is joined to the power arc that has already been connected and so on all the arcs are alternatively joined It is recommended to connect the o...

Page 15: ...eet After marking the sheet but prior to cutting it mark the side with the covering layer on each piece of the sheet when the shipping film is removed sheet sides look the same Shipping film shall be...

Page 16: ...2 5 4 4 6 5 7 3 2100 730 1200 2400 2605 5210 2710 950 2500 12000 1100 wall ceiling window CUTTING LIST FOR THE ANTEROOM CUT POLYCARBONATE SHEET IN STRICT ADHERENCE TO FIG 10 3 Honeycomb polycarbonate...

Page 17: ...fig 10 5 Fig 10 5 Using a knife adjust covering pieces to arcs 4 and girder 20 and then install sealing profile in accordance with fig 10 6 self tapping screw 4 2 2 Fig 10 4 end covering end covering...

Page 18: ...from the base package washer 6 from the base package bolt 6 14 washer 6 nut 6 tingle arc base sheet At first install all joint plates and tingles 2940 3 0 0 0 2940 2100 nut 6 ridge shape washer 32 6 b...

Page 19: ...rill holes in part 1 across the holes in bottom draw band top draw band top draw band bottom draw band nut 6 washer 6 bolt 6 60 washer 6 FASTENING OF COVERING bend the ends of the tingle top draw band...

Page 20: ...0 germany dancover com Switzerland 0840 000125 schweiz dancover com France 0975 181 800 france dancover com Austria 0662 626935 austria dancover com Sweden 040 233 262 sverige dancover com Finland 0 9...

Reviews: