background image

6

Warranty responsibility

1. The manufacturer shall be responsible for the complete set of parts for 
the greenhouse frame.
2.  The  manufacturer  shall  be  responsible  for  assemblability  of  the 
greenhouse in accordance with the manual.
3. The manufacturer shall be responsible for the greenhouse endurance in 
the specified weather conditions.
4. Time period for making claims is 24 months after the day of purchase.

Warranty provisions

Warranty responsibility shall not cover the following cases:

1. Installation of the greenhouse in violation of the manual provisions.
2. Violation of operation rules.
3. Unintended use of the greenhouse.
4. Deformation of the greenhouse due to soil movement.
5. Floods, hurricanes and other natural disasters.

The manufacturer shall retain the right 

to make changes to the greenhouse design. 

Warranty responsibility 

Summary of Contents for ARROW 2,6

Page 1: ...20 03 2018 for Greenhouse ARROW 2 6 Manual ...

Page 2: ...Length any divisible by 2 m Height 2 47 m width 2 6 m ...

Page 3: ...as two door openings and two ventilating windows in the opposite ends Side ventilating windows are supplied following the customer s request Assembly and operation of the greenhouse should be performed in strict compliance with the assembly manual and operation rules as specified in the technical certificate The technical certificate must be preserved Description Greehouse specifcations Chart 1 Le...

Page 4: ...preader 2 13 Door horizontal part 6 16 Butt end strap 2 17 Door strap for the latch 4 18 Reinforcement nogging piece 2 Left tubular reinforcement 2 Right tubular reinforcement 2 Package 4 ridge profile Ridge profile 2 Package 5 weather strips Hinge strip m 3 6 Door strip m 10 Butt end strip m 12 Package 6 fasteners and parts Angle 20 Ridge strap 3 Support hook 8 Screw М5х10 378 Screw М5х14 22 Scre...

Page 5: ...2 Technical certificate Detailed list of parts for Inset Package 1 2 Beam 20 Package 2 3 Support 4 1 Stand 4 4н Lower arch 4 4в Upper arch 4 9 Horizontal strainer 2 10 Side brace 8 11 Brace spreader 4 18 Reinforcement nogging piece 4 Package 3 Ridge profile 2 Package 4 Lower wire bandage 4 Upper wire bandage 2 Ridge strap 2 Screw М5х10 172 Screw М5х35 16 Screw М5х14 4 винт М5х50 4 Screw М4х35 8 Sc...

Page 6: ...e 1 Rinse the sheet with warm water 2 Wash the sheet with a solution of soft soap or with a domestic detergent and warm water using a soft rag or a sponge to take away the dirt 3 Rinse with cold water and dry with a soft rage to take away the water By disinfection of the greenhouse from fungus and biological diseases pathogens do not use sulphuric sticks When cleaning polycarbonate sheets never us...

Page 7: ...d weather conditions 4 Time period for making claims is 24 months after the day of purchase Warranty provisions Warranty responsibility shall not cover the following cases 1 Installation of the greenhouse in violation of the manual provisions 2 Violation of operation rules 3 Unintended use of the greenhouse 4 Deformation of the greenhouse due to soil movement 5 Floods hurricanes and other natural ...

Page 8: ...parts as they do not have sufficient endurance before the whole structure is assembled Use supports e g chairs at interim stages of assembly to make sure the frame is lifted steadily and evenly To make sure holes coincide when assembling complicated joints use a 5 mm thick nail or a cone shaped hand punch 1 2 3 4 Some parts may have spare holes which are there due to uniformity of parts introducti...

Page 9: ...dge strap Angle 4В 2 2 4Н 6 2 1 Support hook 4Н view from outside 4В 5 Support hook 7 1 6 6 view from outside Angle 4Н 2 3 1 В Б Г Е Д 4Н 4Н 4В 4В 5 2 2 9 10 10 5 7 8 6 6 6 1 1 3 2 2 2 2 6 11 18 18 2 Pic 1 view from outside view from inside А А Г E Д Б В Angle view from inside ...

Page 10: ...Greenhouse ARROW extended by any number of insets Pic 2 Pic 3 General view of the inset for Greenhouse ARROW Each inset extends the greenhouse length by 2 m 858 4060 1000 1000 1000 1000 2577 Plan of greenhouse stands resting on the foundation Pic 4 60 21 ...

Page 11: ... the greenhouse Performtheassemblyinaccordancewiththepicturesofassemblystagesandthejoints as shown in Pic 5 12 The pictures illustrate assembly of a 4 m long greenhouse The required length of a greenhouse is attained by adding corresponding parts from Inset package s To join the parts screws М5х10 are used On the site selected for installation of the greenhouse dig holes as shown by the scheme in ...

Page 12: ... А Assembly stages Manual 4н 4в А view from inside А view from outside Support hook Б 1 Б 2 Pic 8 2 2 2 2 Pic 8 4н 4н 4н 4н 4н 2 2 2 2 2 2 2 2 2 2 4н 2 4н 2 А А When installing the greenhouse by setting it into the ground without a foundation join parts 1 and 3 to the frame Put into the vacant hole of part 3 the lower wire binding Install parts of butt ends 6 6к 7 8 3 1 Б 2 one sided adhesive tape...

Page 13: ...ces on each arch parts 10 A side brace in assembled of two parts 10 Brace spreader 11 is installed at the joint of parts 10 and fastened to arch 4н 9 10 4в 10 10 11 10 2 2 Assembly stages Pic 11 А Г В Б Д Е Manual 4н 4н 4н 4н 9 18 18 10 А Г E Д Б В ...

Page 14: ... 20 20 19 19 Door Assembly the door and the butt end ventilating window from parts 12 13 14 15 19 20 Pic 12 14 12 13 14 15 Б Pic 12 А 13 14 15 15 15 14 14 14 13 Window 19 20 13 14 12 12 15 15 13 14 13 12 12 12 12 12 15 13 А Б ...

Page 15: ... and 8 while the upper edge is 30 mm above the lower edge of part 5 Cut out the pattern Mark lines on the remaining part of the sheet using the cutout pattern in accordance with the cutting plan Pic 13 Cutting is better done with an electrical fret saw or with a jigsaw with small sawteeth 14 the cutting plan CUT THE POLUCARBONATE SHEET IN STRICT ACCORDANCE WITH PIC 13 AND PIC 14 Honeycombed polyca...

Page 16: ...before installation The protective layer is usually on the side with inscriptions on the packaging film On the other side of the sheet the film is clear After drawing the planning lines on the sheet but before cutting it mark the protective side of every piece of polycarbonate after removing the packaging film both sides of the sheet look very similar The packaging film should be removed from both...

Page 17: ...elf tapping screws with washers Holes for screws should be drilled with 5 mm bore from inside the greenhouse through ready made holes in frame parts Install pieces of half rounded ridge by fastening it to angles with self tapping screws with washers Cut off any overlapping parts on the sides 4 Use a knife to smooth the cover surface according to the arches 4н and 4в and then install weather strips...

Page 18: ...ace 17 ScrewМ5х14 Cover surface Scotch tape Door weather strip hinge Scotch tape Door weather strip Hinge strip Cover surface Door weather strip Cover surface hinge hinge Scotch tape Cover surface Cover surface Scotch tape Scotch tape handle handle Рiс 18 surface Door weather strip handle Stud pin washer washer Angle ...

Page 19: ...there is a joint between parts of butt end cover surfaces Pic 21 Pic 23 Butt and cover door 20 25мм the output of surface contour door door Washer detail 12 Butt and cover Screw М5х35 Screw М5х35 ScrewМ5х10 Screw М5х10 Screw М5х35 Hinge strip hinges Washer Washer detail 12 door Pic 22 Butt end cover 16 Screw М5х50 Screw М5х35 Screw М5х35 detail 5 Door weather strip Door weather strip Door weather ...

Page 20: ...door to fix it in the open position Pic 24 Part 16 Рic 24 hook butt end surface angle screw М4х10 screw М5х10 Ground level 2 8 10 Install tubular reinforcements for door openings as shown in Pic 25 Fasten them to the butt end with screw М5х35 through the butt end cover surface and with screw М5х10 on the beam Pic 25 Tubular reinforcement Washer screw М5х35 ...

Page 21: ...6 Use straight part of the tube running to bend rotator in the opposite direction Fig 27 Set elastic header on the rotator Fig 28 This construction allows to push the door in the closed position being both outside and inside the greenhouse Pic 26 Pic 27 Pic 28 17 17 Pipe for bending Pipe for bending handle 12 20 12 Rotator for locking the window is installing similarly Semi Semi ...

Page 22: ...ort film The film on the other side of sheet is transparent After marking the sheet but prior to its cutting make a mark on the protected side of the sheet for each piece after removal of the transport film sheet sides are not visually different The transport film is stripped from both sides immediately before fixing the cladding on the frame Sections of polycarbonate with open honeycombs should b...

Page 23: ...urface 1000 х1 х2 L 1 05м Two side adhesive tape Before coating it is necessary to cut the outer surface of the upper polycarbonate sheet for bending on the ridge middle of sheet The arrow on the details is directed to the front side greenhouse ...

Page 24: ...Manual 23 14 х3 M4x25 х3 do not fully tighten Cutting out and fastening cover surface ...

Page 25: ...Manual 24 15 х1 one sided adhesive tape Cutting out and fastening cover surface ...

Page 26: ...Manual 25 16 х4 х4 M4x35 х4 Cutting out and fastening cover surface х1 х3 M4x25 х3 L 1 0м ...

Page 27: ...Manual 26 Cutting out and fastening cover surface 17 18 Details of the ridge profile are connected along the length with the threaded end of the screw directed outside screw М5х14 ...

Page 28: ...Manual 27 Cutting out and fastening cover surface Ridge profile х1 M6x60 M6 х1 х2 х1 х1 Upper wire bandage M6x60 M6 х1 х2 х1 х1 Upper wire bandage ...

Page 29: ...40 germany dancover com Switzerland 0840 000125 schweiz dancover com France 0975 181 800 france dancover com Austria 0662 626935 austria dancover com Sweden 040 233 262 sverige dancover com Finland 0 931 581 720 suomi dancover com Nederland 0 858 880 524 nederland dancover com Poland 22 300 8602 polska dancover com Ireland 0 151 33 003 ireland dancover com Luxembourg 49 041 0266 7040 luxembourg da...

Reviews: