![DALBO GREENLINE 300 Manual Download Page 28](http://html.mh-extra.com/html/dalbo/greenline-300/greenline-300_manual_503817028.webp)
GREENLINE
Side 28
Assembly
1
Fit new gaskets (pos. 5+6+7+8+9) in upper part, plus collar shoe.
2
Lubricate thread in upper part (pos. 3) and cylinder tube (pos. 1) with grease or
oil.
3
Fit upper part (pos. 3) on ram shaft.
4
Fit collar shoe (pos. 4) and screw on lock nut,
secure with Loctite
. Ensure that
thread is absolutely clean and free of oil or other impurities before applying Loc-
tite.
Do not fill with oil for 12 hours after use of Loctite.
5
Lubricate outer collar shoe gasket in contact with cylinder tube and inside of
cylinder tube with oil, push ram into centre position.
6
Fit upper part onto cylinder tube and tighten.
7
For fitting cylinder see ”
Replacing harrow depth-adjustment cylinder
Removal/fitting wheel
Before removing wheel, fully extend roller to rest on ground. Wheels will then be
raised free of ground.
Remove wheel nuts. Remove wheel. Replace wheel, hand-tighten wheel nuts. Lower
wheels to ground. Tighten wheel nuts to 300 Nm.
Ensure wheel nuts and wheel surfaces are clean to avoid nuts loosening.
Replacing wheel bearings
Fig. 36
1.
Remove hub cap pos. 21
2.
Remove split pin pos. 20.
3.
Remove castle nut pos. 19.
4.
Tap out axle pos. 2
5.
Remove bearings pos. 17+18
6.
Remove seal ring pos. 16
Summary of Contents for GREENLINE 300
Page 1: ...GREENLINE 300 EN GREENLINE 300 Serial no 100 XXX ...
Page 2: ......
Page 4: ......
Page 31: ...GREENLINE Side 31 Hydraulic diagram Fig 39 ...
Page 32: ...GREENLINE Side 32 Spare parts ...