background image

5

4

EN

EN

EN

EN

Setting the timer (PIC 2)

The timer is located under the front panel of the fan next to the terminal block and is marked as "Time". By turning the 
timer carefully to the left or right using a small flat head screwdriver, set the fan rundown time from 15 seconds to 45 
minutes.

MODE 1

 – light sensor (on), time rundown

Wire connection:

 Connect the brown phase wire to the L terminal and the blue neutral wire to the N terminal. Place the 

I/II/III jumper as seen in PIC 4a. Set the A/B jumper to the position of PIC 1a.

The fan starts when the light is on (it must be on for at least 45 seconds) and it will be ventilating throughout the entire 
lighting period. After turning the light off, the fan runs down according to the timer setting.

Note: If the light is turned off earlier (i.e., it has not been on for at least 45 seconds), the fan will not start.

MODE 2

 – light sensor (off), time rundown

Wire connection:

 Connect the brown phase wire to the L terminal and the blue neutral wire to the N terminal. Place the 

I/II/III jumper as seen in PIC 4a. Set the A/B jumper to the position of PIC 1b.

The fan starts after the light has been turned off (it must have been on for at least 90 seconds) and it will be ventilating 
throughout the entire time set on the timer.

Note: If the light is turned off earlier (i.e., it has not been on for at least 90 seconds), the fan will not start after turning the 
light off.

MODE 3

 – time r separate switch

Wire connection:

 Connect the brown phase wire to the L terminal, the black switching wire to the T terminal and the 

blue neutral wire to the N terminal. Place the I/II/III jumper as seen in PIC 4b. Set the A/B jumper to the position of 
PIC

 

1a.

Light sensor inactive. The fan starts whenever the position on the switch is switched over (no matter what the position) 
and is ventilating throughout the entire time set on the timer.

Note: If the switch position is switched over during the time rundown, the fan stops immediately.

MODE 4

 – time r lighting switch

Wire connection:

 Connect the brown phase wire to the L terminal, the black switching wire to the T terminal and the 

blue neutral wire to the N terminal. Place the I/II/III jumper as seen in PIC 4c. Set the A/B jumper to the position of 
PIC

 

1a.

Light sensor inactive. The fan starts when the switch (i.e., the light) is turned on and runs throughout the entire lighting 
period. After the switch (light) has been turned off, the fan continues ventilating throughout the time set on the timer.

Note: If the switch (light) is turned on again during the time rundown, the fan will continue running without interruption 
until the switch (light) is turned off again and then it will run down according to the timer setting.

MODE 5

 – time r separate button

Wire connection:

 Connect the brown phase wire to the L terminal, the black switching wire to the T terminal and the 

blue neutral wire to the N terminal. Place the I/II/III jumper as seen in PIC 4c. Set the A/B jumper to the position of 
PIC

 

1a.

Light sensor inactive. The fan is started by pressing the button and runs throughout the time set on the timer.

Note: If the button is pressed again during the active rundown, the rundown restarts from the beginning.

NOMIA ZW (models with timer, humidistat and light sensor)

Basic information about the connection:

1)

 

Switch off the electric circuit that you are going to work on.

2)

 

Unscrew the screw on the front panel's side and remove the cover under which the terminal block with three 
terminals is located.

3)

 

The terminals are marked with letters T (interruptible phase), L (permanent phase) a N (neutral).

4)

 

Read the wiring diagram carefully (PIC 7a, PIC 7b, PIC 7c) depending on the mode selected (see below).

5)

 

Run the supply cables through the rubber bushing and connect them in the terminal block as seen in the wiring 
diagram.

6)

 

Set the timer (Time).

7)

 

Set the humidistat (Humidity).

8)

 

Set the I/II jumper and the A/B jumper depending on the mode selected (see below).

9)

 

After completing the installation, connect the electric circuit and test the function of the fan.

Setting the timer (PIC 2)

The timer is located under the front panel of the fan next to the terminal block and is marked as "Time". By turning the 
timer carefully to the left or right using a small flat head screwdriver, set the fan rundown time from 15 seconds to 45 
minutes.

Setting the humidistat (PIC 3)

The humidistat is located under the front panel of the fan next to the terminal block and is marked as "Humidity". By 
turning the humidistat carefully to the left or right using a small flat head screwdriver, set the relative humidity to trigger 
the fan from 60% RH to 100% RH.

MODE 1

 – humidity sensor, time rundown

Wire connection:

 Connect the brown phase wire to the L terminal and the blue neutral wire to the N terminal. Place the 

I/II jumper as seen in PIC 6b. Set the A/B jumper to the position of PIC 1a.

Light sensor inactive. The humidity sensor will start the fan based on the set value ("Humidity"). After the humidity 
decreases, the fan continues ventilating for the remaining time set on the timer ("Time")

MODE 2

 – humidity sensor, time r separate switch

Wire connection:

 Connect the brown phase wire to the L terminal, the black switching wire to the T terminal and the 

blue neutral wire to the N terminal. Place the I/II jumper as seen in PIC 6b. Set the A/B jumper to the position of PIC 1a.

Light sensor inactive. The humidity sensor will start the fan based on the set value ("Humidity"). After the humidity 
decreases, the fan continues ventilating for the remaining time set on the timer ("Time"). The fan can be started 
manually by switching over the position on the switch (no matter what the position) and is ventilating throughout the 
entire time set on the timer.

Note: If the switch position is switched over during the time rundown, the fan stops immediately.

MODE 3

 – light sensor (on), humidity sensor, time rundown

Wire connection:

 Connect the brown phase wire to the L terminal and the blue neutral wire to the N terminal. Place the 

I/II jumper as seen in PIC 6a. Set the A/B jumper to the position of PIC 1a.

The fan starts when the light is on (it must be on for at least 45 seconds) and it will be ventilating throughout the entire 
lighting period. After turning the light off, the fan runs down according to the timer setting ("Time"). The humidity sensor 
will start the fan based on the set value ("Humidity") – whether it is light or dark. After the humidity decreases, the fan 
continues ventilating for the remaining time set on the timer.

Note: If the light is turned off earlier (i.e., it has not been on for at least 45 seconds), the fan will not start.

Summary of Contents for NOMIA

Page 1: ...NOMIA GEBRAUCHSANWEISUNG HASZN LATI TMUTAT N VOD K POU IT INSTRUKCJA OBS UGI N VOD NA POU ITIE INSTRUC IUNILE USER MANUAL...

Page 2: ...PIC 1a PIC 1b PIC 2 PIC 3 PIC 4a PIC 4b PIC 4c PIC 5a PIC 5b PIC 5c PIC 6a PIC 6b PIC 7a PIC 7b PIC 7c...

Page 3: ...for continuous ventilation SAFETY REQUIREMENTS NOMIA models without timer and humidistat Connection 1 Switch o the electric circuit that you are going to work on 2 Unscrew the screw on the front pane...

Page 4: ...black switching wire to the T terminal and the blue neutral wire to the N terminal Place the I II III jumper as seen in PIC 4b Set the A B jumper to the position of PIC 1a Light sensor inactive The fa...

Page 5: ...seen in PIC 6b Set theA B jumper to the position of PIC 1a Light sensor inactive The humidity sensor will start the fan based on the set value Humidity After the humidity decreases the fan continues v...

Page 6: ...and the blue neutral wire to the N terminal Place the I II jumper as seen in PIC 6b Set theA B jumper to the position of PIC 1b The fan starts after the light has been turned o it must have been on fo...

Page 7: ...grostat Anschlie en 1 Schalten Sie den elektrischen Schaltkreis an dem Sie arbeiten werden aus 2 Schrauben Sie die Schraube an der Seite der vorderen Platte heraus und nehmen Sie die Verkleidung ab un...

Page 8: ...an die Klemme T an Den blauen Nullleiter schlie en Sie an die Klemme N an Positionieren Sie den Jumper I II III gem derAbbildung PIC 4b Stellen Sie den JumperA B in die Position PIC 1a Nichtaktiver Li...

Page 9: ...me N an Positionieren Sie den Jumper I II gem derAbbildung PIC 6b Stellen Sie den JumperA B in die Position PIC 1a Nichtaktiver Lichtsensor Der Feuchtigkeitssensor startet den Ventilator auf der Grund...

Page 10: ...braunen Phasenleiter an die Klemme L an Den blauen Nullleiter schlie en Sie an die Klemme N an Positionieren Sie den Jumper I II gem derAbbildung PIC 6b Stellen Sie den JumperA B in die Position PIC...

Page 11: ...l tory mohou b t pou v ny pro nep etr it provoz BEZPE NOSTN PO ADAVKY NOMIA modely bez asova e a hygrostatu Zapojen 1 Vypn te elektrick okruh na kter m budete pracovat 2 Vy roubujte roub na boku p edn...

Page 12: ...rn sp nac vodi zapojte do svorky T Modr nulov vodi zapojte do svorky N Jumper I II III um st te podle obr zku PIC 4b JumperA B nastavte do pozice PIC 1a Neaktivn sv teln senzor Ventil tor se spust s k...

Page 13: ...nulov vodi zapojte do svorky N Jumper I II um st te podle obr zku PIC 6b JumperA B nastavte do pozice PIC 1a Neaktivn sv teln senzor idlo vlhkosti spust ventil tor na z klad nastaven hodnoty Humidity...

Page 14: ...dob h Zapojen vodi Zapojte hn d f zov vodi do svorky L Modr nulov vodi zapojte do svorky N Jumper I II um st te podle obr zku PIC 6b JumperA B nastavte do pozice PIC 1b Ventil tor se spust po zhasnut...

Page 15: ...til tory sa m u pou va na nepretr it prev dzku BEZPE NOSTN PO IADAVKY NOMIA modely bez asova a a hygrostatu Zapojenie 1 Vypnite elektrick okruh na ktorom budete pracova 2 Vyskrutkujte skrutku na boku...

Page 16: ...y sp nac vodi zapojte do svorky T Modr nulov vodi zapojte do svorky N Jumper I II III umiestnite pod a obr zka PIC 4b JumperA B nastavte do poz cie PIC 1a Neakt vny sveteln senzor Ventil tor sa spust...

Page 17: ...y L Modr nulov vodi zapojte do svorky N Jumper I II umiestnite pod a obr zka PIC 6b JumperA B nastavte do poz cie PIC 1a Neakt vny sveteln senzor Sn ma vlhkosti spust ventil tor na z klade nastavenej...

Page 18: ...vlhkosti asov dobeh Zapojenie vodi ov Zapojte hned f zov vodi do svorky L Modr nulov vodi zapojte do svorky N Jumper I II umiestnite pod a obr zka PIC 6b JumperA B nastavte do poz cie PIC 1b Ventil t...

Page 19: ...BIZTONS GI K VETELM NYEK NOMIA id z t s higroszt t n lk li modellek Bek t s 1 Kapcsolja ki az elektromos ramk rt amelyen dolgozni fog 2 Csavarja ki az el lap oldal n l v csavart s vegye le a fedelet...

Page 20: ...atlakoz hoz Csatlakoztassa a k k semleges vezet ket az N csatlakoz hoz Helyezze el az I II III jumpert a 4b bra szerint ll tsa azA B jumpert az 1a bra szerinti poz ci ba Inakt v f ny rz kel A ventil t...

Page 21: ...6b bra szerint ll tsa azA B jumpert az 1a bra szerinti poz ci ba Inakt v f ny rz kel A p ratartalom rz kel a be ll tott rt k P ratartalom alapj n ind tja el a ventil tort Amikor a p ratartalom cs kken...

Page 22: ...akoz hoz Csatlakoztassa a k k semleges vezet ket az N csatlakoz hoz Helyezze el az I II jumpert a 6b bra szerint ll tsa azA B jumpert az 1b bra szerinti poz ci ba Aventil tor akkor indul el amikor a l...

Page 23: ...ci g ej WYMAGANIA DOTYCZ CE BEZPIECZE STWA NOMIA modele bez timera i higrostatu Pod czenie 1 Wy czy obw d elektryczny na kt rym b d przeprowadzane prace 2 Wykr ci rub na boku przedniego panelu i zdj p...

Page 24: ...Niebieski przew d zerowy pod czy do zacisku N Jumper I II III umie ci wed ug rysunku PIC 4b JumperA B ustawi w pozycjiPIC 1a Nieaktywny czujnik o wietlenia Wentylator w czy si z ka dym prze czeniem p...

Page 25: ...skuN JumperI IIumie ci wed ugrysunkuPIC 6b JumperA B ustawi w pozycjiPIC 1a Nieaktywnyczujniko wietlenia Czujnikwilgotno ciw czy wentylatorna podstawienastawionejwarto ci Humidity Po obni eniuwilgotno...

Page 26: ...czenieprzewod w Pod czy br zowy przew d fazowy do zacisku L Niebieskiprzew d zerowy pod czy do zaciskuN JumperI IIumie ci wed ugrysunkuPIC 6b JumperA B ustawi w pozycjiPIC 1b Wentylator w czy si po z...

Page 27: ...roiectat pentru ventilarea spatiilor reziden iale i nereziden iale de dimensiuni mici sau medii Ventilatoarele pot utilizate pentru func ionare continu CERIN E DE SIGURAN NOMIA modele f r timer i higr...

Page 28: ...blul nul albastru la clema N Pozi iona i jumperul I II III a a cum este indicat n imagine PIC 4b Seta i jumperulA B n pozi ia PIC 1a Senzor de lumin inactiv Ventilatorul porne te la ecare comutare a p...

Page 29: ...jumperulA B n pozi ia PIC 1a Senzor de lumin inactiv Senzorul de umiditate porne te ventilatorul n func ie de valoarea setat Humidity Dup ce umiditatea este redus ventilatorul ventileaz pentru timpul...

Page 30: ...te timer Conectarea cablurilor Conecta i cablul de faz maro la clema L Conecta i cablul nul albastru la clema N Pozi iona i jumperul I II conform imaginii PIC 6b Seta i jumperulA B n pozi ia PIC 1b Ve...

Page 31: ...31 BG BG BG 220 240 V 50 Hz IP24 1 40 C Dalap NOMIA NOMIA 1 2 3 4 NOMIA Z I 1 2 3 T L N 4 PIC 5a PIC 5b PIC 5c 5 6 Time 7 I II III A B 8...

Page 32: ...32 BG BG BG PIC 2 Time 15 45 1 L N I II III PIC 4a A B PIC 1a 45 45 2 L N I II III PIC 4a A B PIC 1b 90 90 3 L I II III PIC 4b A B PIC 1a 4 L I II III PIC 4c A B PIC 1a 5 L I II III PIC 4c A B PIC 1a...

Page 33: ...N 4 PIC 7a PIC 7b PIC7c 5 6 Time 7 Humidity 8 I II A B 9 PIC 2 Time 15 45 PIC 3 Humidity 60 100 1 L N I II PIC 6b A B PIC 1a Humidity Time 2 L I II PIC 6b A B PIC 1a Humidity Time 3 L N I II PIC 6a A...

Page 34: ...34 BG BG BG 4 L I II PIC 6a A B PIC 1a 45 Time Humidity 45 5 L N I II PIC 6b A B PIC 1b 90 Time Humidity 90 6 L I II PIC 6b A B PIC 1b 90 Time Humidity 90...

Page 35: ...35...

Page 36: ...rieden odpad elektrick a elektronick zariadenia Szelekt v hullad k elektromos s elektronikus berendez sek Sortowany odpad urz dzenia elektryczne i elektroniczne Reciclarea de eurilor Echipamente elect...

Reviews: