Start-Up Procedure
11
6 Start-Up Procedure
Start-Up Checklist
•
Confirm that power is correctly connected to the display.
•
Confirm there is sufficient power according to display requirements.
•
Confirm a main disconnect is installed.
•
Confirm the display is connected to an earth-ground electrode.
•
Confirm the external communication equipment (signal enclosure, client radio, etc.)
is properly installed.
• Inspect signal connections at the control computer.
•
Confirm that any necessary network connections have been made.
• Inspect peripheral equipment (temperature sensor, light sensor, etc.) for proper
installation.
•
Confirm that the control computer is correctly configured according to the
Vanguard
®
Software Help File [F1]
.
Note:
Before starting up the display, review this checklist to ensure that all parts are
ready to operate correctly.
Summary of Contents for VANGUARD VC6
Page 4: ......